10.07.2015 Views

43-101 2009 Technical Report On The San Antonio Project, Baja ...

43-101 2009 Technical Report On The San Antonio Project, Baja ...

43-101 2009 Technical Report On The San Antonio Project, Baja ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PEDIMENT GOLD CORP.Chart and Map of concessions<strong>The</strong> concession data and holding costs held by Compañia Minera Pitalla S.A. de C.V. arelisted in the following table. A map showing these individual concessions locations ispresented on the previous page.5.1 Relation of mining concessions of the <strong>San</strong> <strong>Antonio</strong> <strong>Project</strong> (costs shown in Mexican pesos)Concession nameTitlenumber Issue dateSurface(has)1st SEM(pesos)2nd SEM(pesos)Cirio 221072 19‐nov‐03 2789.94 $ 39,728.68 $ 39,728.68Emily 221074 19‐nov‐03 518.24 $ 7,379.72 $ 7,379.72Trini Fraccion I 229908 28‐jun‐07 34450.48 $ 158,472.20 $ 158,472.20Trini Fraccion II 229909 28‐jun‐07 41.26 $ 189.78 $ 189.78Trini Fraccion III 229910 28‐jun‐07 5.68 $ 26.13 $ 26.13Trini Fraccion IV 229911 28‐jun‐07 7.51 $ 34.56 $ 34.56Triunfo Este Fracc. I 227890 08‐sep‐06 495.37 $ 2,282.00 $ 2,282.00Triunfo Este Fracc. II 227891 08‐sep‐06 350.00 $ 1,610.00 $ 1,610.00Triunfo Este Fracc. III 227892 08‐sep‐06 0.30 $ 5.00 $ 5.00Triunfo Oeste Fracc. I 227893 08‐sep‐06 848.69 $ 3,905.00 $ 3,905.00Triunfo Oeste Fracc. II 227894 08‐sep‐06 95.00 $ <strong>43</strong>7.00 $ <strong>43</strong>7.00Reducción el Triunfo Uno Fracción 1 233087 9‐Dec‐08 1,974.67 $ 9,083.46 $ 9,083.46Reducción el Triunfo Uno Fracción 2 233088 9‐Dec‐08 136.92 $ 629.85 $ 629.85El Triunfo Ampliación 233086 9‐Dec‐08 3,140.01 $ 14,444.04 $ 14,444.04Valle Perdido 233089 9‐Dec‐08 1,473.84 $ 6,779.67 $ 6,779.67Semester Subtotal $245,007.08 $245,007.08GRAND TOTAL (yearly cost of retaining properties for <strong>San</strong> <strong>Antonio</strong> project)$490,014.16 PESOS<strong>The</strong> above chart shows total <strong>San</strong> <strong>Antonio</strong> area concession holding costs and are listed asindividual concession costs per semester that are to be paid to the Mexican Federalgovernment that were current for <strong>2009</strong>. <strong>The</strong> holding costs are paid twice yearly as shown inthe chart. <strong>The</strong> costs vary from year to year, generally rising incrementally higher eachsucceeding year.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!