10.07.2015 Views

Service Contract No 2007 / 147-446 - Swaziland

Service Contract No 2007 / 147-446 - Swaziland

Service Contract No 2007 / 147-446 - Swaziland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The effects of different nozzles/emitters and different sprinkler packages observed in thisproject were evaluated using the table below. Different emitters respond differently to thesame amount of pressure and table 6 below indicates the properties of the different sprinklerpackages found on site.Table 6.Technical properties of sprinklers found on site at 35m operating pressureSprinkler Package <strong>No</strong>zzle size Discharge (m3/hr) Wetted Radius (m)VYRSA 70 11/64’’ 1.36 15.9Rain bird 14070 11/64’’ 1.39 15.2Rain bird BH30 11/64’’ 1.38 14.8RC 140 11/64’’ 1.36 15.9Four sprinkler packages and one nozzle sizes was identified in both phases as shown in table6 above. Flow variation due to the different sprinkler – nozzle combinations is 2.18% forphase one and 0% for phase two. Emitter variation, therefore does not affect discharge anddistribution uniformities of this system, except for the wetted radiuses. The averageapplication rate of the above combination is 1.36m3/hr and is acceptable according tosugarcane norms. This different combination has an effect also on the wetting diameter dueto their different body trajectory angles.Gross application rate (GAR)The gross application rate (GAR) of the sprinkler was thereafter calculated, by means of thefollowing formula;GAR qe1000A ....…………………………………. (11) mm/hWhere; GAR = Gross Application RateA = wetted area (m 2 )The GAR is a fraction of emitter discharge and sprinkler spacing as indicated by equation 11above. The average GAR for Maphobeni phase one irrigation is 4.2mm/hr and 3.9mm/hr forphase two. The recommended GAR is 4.2mm/hr and this means that Maphobeni FA isslightly under-irrigating phase two. However, when flow measurements readings from Block Iare excluded the GAR of phase two increases to 4.2mm/hr.Maphobeni Farmers Association Report - 2009 Page - 45 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!