Service Contract No 2007 / 147-446 - Swaziland
Service Contract No 2007 / 147-446 - Swaziland
Service Contract No 2007 / 147-446 - Swaziland
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Figure 20. Measuring apparatus for sprinkler nozzle sizeLeaksTimely maintenance and repair of minor leaks are often neglected in this system. The leaks inthe pipes of the supply network of this irrigation system caused a drop in operating pressureand an increase in pump flow. This increase in pump duty reduces the efficiency at which thepump operates, causing further pressure and delivery reductions. A drop in the operatingpressure causes a change in the performance of sprinkler, as shown in table 4 above. Theeffective application rate of the system decreased. Mainly, these leaks are observed insprinklers, sprinkler stand-dragline connections, broken dragline, pipelets, hydromatics,mainline, etc. it is important that all leaks are located quickly and repaired. A leak preventionprogram should include regular replacement of damaged draglines.Figure 21. Phase one dragline leakagesMaphobeni Farmers Association Report - 2009 Page - 42 -