Phase Two:‣ This phase is supplied by a river pump and a booster pump station, each of these pumphouses have two pumping units‣ This phase is 95 hectares and requires at least 376m3/hr flow to meet irrigationrequirements.‣ Water from the Usuthu River is pumped by two identical Howden 100-400 pumps eachdriven by a 30kW two pole motor into a small balancing dam.‣ In order to meet irrigation requirements each of these pumps must generate at least188m3/hr system flow.‣ Pressure requirements from the pump station to the balancing dam are estimated at 35m‣ This duty point is within the operating range of the installed river pumps.‣ Pressure requirements from the balancing dam to the critical sprinkler are estimated at90m. The impellor diameter of these pumps is 246mm and in order for these pumps togenerate the required pressure a 255mm impellor diameter must be installed in thesepumps.‣ Both booster pumps can deliver the required 188m3/hr system flow.Maphobeni Farmers Association Report - 2009 Page - 32 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!