10.07.2015 Views

Service Contract No 2007 / 147-446 - Swaziland

Service Contract No 2007 / 147-446 - Swaziland

Service Contract No 2007 / 147-446 - Swaziland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EAC COMPUTATION MATRIXThese costs have been calculated only for Phase Two of theProjectITEM COST ITEM Main Bid1 Infield irrigationCapital cost (E) 1,080,800.00Useful life (years) 10Annual maintenance (%) 3EAC of infield irrigation (E) 208,594.402 Distribution systemCapital cost (E) 1,440,040.00Useful life (years) 20Annual maintenance (%) 2EAC of Distribution system (E) 197,285.483 Pumping plantCapital cost (E) 173,040.00Useful life (years) 15Annual maintenance (%) 1EAC of Pumping plant (E) 24,398.644 FiltersCapital cost (E) -Useful life (years) 15Annual maintenance (%) 3EAC of Filters (E) -5 Annual Energy Cost (E) 404,175.63Total EAC (E) 430,278.52Energy cost as a % of total EAC 93.93For sprinkler irrigation a 40% EAC value is accepted. A higher and a lower figure indicatesover design and under design respectively4 . 3 S u p p l y S y s t e mThe evaluation of the supply system is discussed under the following headings;Maphobeni Farmers Association Report - 2009 Page - 30 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!