10.07.2015 Views

Service Contract No 2007 / 147-446 - Swaziland

Service Contract No 2007 / 147-446 - Swaziland

Service Contract No 2007 / 147-446 - Swaziland

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

dFigure 4 Required radius of 90 bends (source: ARC (<strong>2007</strong>))r 2d100mm …………………………………... (2)Where: r = radius of bend (mm)d = inner diameter of suction pipe (mm).All 90° bends measured in the three pump stations had a shorter radius than required.200mm 90° bends in PS 1 are 200mm in radius and PS 2 and 3 250mm 90° bends have aradius of 350mm. According to figure 4 and equation 2 above the required minimum radius is500mm and 600mm for the two sizes respectively. However, there is more than five time thesuction and delivery pipe size diameter pipe further on from these bends; the effects of theincorrect sizes are insignificant.Figure 5. 90° suction bendsMaphobeni Farmers Association Report - 2009 Page - 16 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!