Novara Environmental Statement 2007 English MEMC-NO ...

Novara Environmental Statement 2007 English MEMC-NO ... Novara Environmental Statement 2007 English MEMC-NO ...

10.07.2015 Views

SUMMARY OF 2007 ENVIRONMENTAL PROGRAMObjectiveArea involvedImprovement actionTargetResultachievedNotesWaste and fluid drainageOptimise WWT operationand improve outputparameter controlsReduce production ofNON-hazardous wasteReduce diffuseemissionsReduce the level of contaminationof the aquiferfrom VOCs, fl uoridesand other pollutantsReduce potential levelof Freon 22 in theatmospherePLANTS: Improve WWT managementwith control of critical parameters(rev. OP, time schedules andplant engineer training)Non-hazardous waste - standard conditionsEmissions - standard conditionsGround contamination - past conditionsWWT: Reduce production of biologicalmud through external recyclingof SiCInstallation of filter on WWT limedissolverDecontamination of ground andaquifer: Waterproof the area markedM2 located at the rear, west side ofthe factoryOzone depleting substances - standard conditionsEmissions to the atmospherePLANTS: Implement plan to replaceFreon 22 with non-ODC cooling fl uidsDIRECT ENVIRONMENTAL ASPECTSConcentrazioneAverage concentrationof fluorides in24 h < o = 4 ppm-5%Reduction of diffusedust emissionCompletion ofrequested 471/99actionsCompletion ofreplacement planINDIRECT ENVIRONMENTAL ASPECTSTargetachievedTargetachievedTargetachievedDelayedactionAction inprogressThe action was postponedto 2008Reduce indirectemissions causedby internal energyconsumptionWater consumptionGuarantee a suffi cientsupply of water forfi re-fi ghting purposesPLANTS: Provide the plant withelectricity and steam produced by thetrigeneration plant with a consequentreduction in the emissions of NOx,SOx, Tot. particles, CO2Groundwater consumption:verify the creation of an autonomousfi re-fi ghting water networkComplete the connectionfor the newsupplyEMERGENCY CONDITIONSComplete verificationTargetachievedTargetachieved38

2008 - 2011 ENVIRONMENTAL PROGRAMObjectiveArea involvedImprovement actionTargetDeadlineDepartmentresponsibleEnergy consumption - standard and anomalous conditionsReduce energyconsumption in thepoints of useReduce the consumptionof water from thesecond aquifer in thepoints of useOPERATIONS: Reduce specific energyconsumption by testing the operation ofmachinery/plants during operation andwhen in standbyOPERATIONS: Reduce the factory’sspecifi c water consumption bytesting the operation of machinery/plants during operation and when instandbyDIRECT ENVIRONMENTAL ASPECTS- 15%Water consumption: 2nd aquifer - standard and anomalous conditions- 15%Consumption of auxiliary production materials - standard and anomalous conditionsRiduzione del consumoReduce specifi c consumptionof chemicalsubstances in the pointsof useOPERATIONS: Reduce the factory’sspecifi c technical gas consumptionby testing the operation of machinery/plantsduring operation and when- 15%in standbyDec - 08Dec - 08Dec - 08INNOVATIONINNOVATIONINNOVATIONMODIFICATIONS: Reduce specificconsumption of HF, HNO3, H3PO4for implementation of fast lightprocess on vertical machine 2.-10%Dec - 08INNOVATIONNon-hazardous waste - standard conditionsReduce production ofNON-hazardous wasteFACTORY: Make personnel awareof the importance of reducing theproduction of mixed urban wastesent for disposal- 5%Dec - 08PASEmissions - standard conditionsReduce particleemissionsPLANTS: Reduce particles derivingfrom the storage of dusty waste mudby means of a monthly inspectionof container area and definition ofperiodic cleaning if necessaryDefi nition andimplementation ofinspection planDec - 08PLANTS39

SUMMARY OF <strong>2007</strong> ENVIRONMENTAL PROGRAMObjectiveArea involvedImprovement actionTargetResultachievedNotesWaste and fluid drainageOptimise WWT operationand improve outputparameter controlsReduce production of<strong>NO</strong>N-hazardous wasteReduce diffuseemissionsReduce the level of contaminationof the aquiferfrom VOCs, fl uoridesand other pollutantsReduce potential levelof Freon 22 in theatmospherePLANTS: Improve WWT managementwith control of critical parameters(rev. OP, time schedules andplant engineer training)Non-hazardous waste - standard conditionsEmissions - standard conditionsGround contamination - past conditionsWWT: Reduce production of biologicalmud through external recyclingof SiCInstallation of filter on WWT limedissolverDecontamination of ground andaquifer: Waterproof the area markedM2 located at the rear, west side ofthe factoryOzone depleting substances - standard conditionsEmissions to the atmospherePLANTS: Implement plan to replaceFreon 22 with non-ODC cooling fl uidsDIRECT ENVIRONMENTAL ASPECTSConcentrazioneAverage concentrationof fluorides in24 h < o = 4 ppm-5%Reduction of diffusedust emissionCompletion ofrequested 471/99actionsCompletion ofreplacement planINDIRECT ENVIRONMENTAL ASPECTSTargetachievedTargetachievedTargetachievedDelayedactionAction inprogressThe action was postponedto 2008Reduce indirectemissions causedby internal energyconsumptionWater consumptionGuarantee a suffi cientsupply of water forfi re-fi ghting purposesPLANTS: Provide the plant withelectricity and steam produced by thetrigeneration plant with a consequentreduction in the emissions of <strong>NO</strong>x,SOx, Tot. particles, CO2Groundwater consumption:verify the creation of an autonomousfi re-fi ghting water networkComplete the connectionfor the newsupplyEMERGENCY CONDITIONSComplete verificationTargetachievedTargetachieved38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!