Doors shall be operated and with provision for manual operation by means ofhand chain. Accessories needed for the satisfactory performance of the doorshall be built-in with the unit.The work executed under this item shall be measured by actual units of rollingup door installed at jobsite complete and ready for service. The computed unitshall bear type of materials and area of opening covered and shall be acceptedby the Engineer.PREPAINTED METAL SHEETSItem 1014 (a)1, 1014 (a)2, 1014 (b) to (d)This item shall consist of furnishing all pre-painted metal sheet materials, toolsand equipment, plant including labor required in undertaking the properinstallation complete as shown on the Plans and in accordance with thisSpecification.All pre-painted metal sheet and roofing accessories shall be oven bakedpainted and shall have an overall thickness with protective coats of 0.400mm,true to profiles indicated on the Plans.Pre-painted rolling sheets shall be fabricated from cold rolled galvanized ironsheets specially tempered steel for extra strength and durability. It shallconform to the material requirements defined in PNS 67:1985Design/color shall be subject to the approval of the Architect/Engineer.Pre-painted steel roofing sheets “long span” for the repair of roofing at MainBuilding shall match the profile of the existing roofing.Removal and Re-installation of existing Pre-painted long span from the OldMotorpool to Jacinto Building shall include labor, equipment and accessories.The removal and reinstallation work shall be carefully done to avoid damage.The work done under this item shall be measured by actual area covered orinstalled with pre-painted steel roofing and accepted to the satisfaction of theEngineer/Architect.CERAMIC TILESItem 1018 (a) and (b)This item shall consist of furnishing all ceramic tiles, materials, tools andequipment including labor required in undertaking the proper installation of96Clark Development Corporation Proposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)

walls and floor tiles as shown on the Plans and in accordance with thisSpecification.Glazed tiles and trims shall have an impervious face of ceramic materials fusedonto the body of the tiles and trims. The glazed surface may be clear white orcolored depending on the color scheme approved by the Engineer. Glazed tilesare used principally for walls.Unglazed tiles shall be hard dense tile of homogeneous composition. Its colorand characteristics are determined by the materials used in the body, themethod of manufacture and the thermal treatment. It is used primarily for floorand walks.Trims are manufactured to match wall tile color, texture and to coordinate withit in dimension.Mortar mix for scratch coat and setting bed shall consist of one part Portlandcement ¼ part lime and 3 parts sand by volume. Surface to receive tile mustbe level, true to elevation, dry, free from dirt, oil and other ointments. Allow atleast seven days curing of scratch coat and setting bed.Installation work shall not be allowed to proceed until unsatisfactory conditionsare corrected.Tiles shall have laid in place for at least 24 hours before grouting of the jointsis started. Grouting mortar shall be white Portland cement or blended withpigments to acquire the color appropriate for the ceramic tile.All works performed under this item shall be measured in square meters forareas actually laid with ceramic tiles and accepted to the satisfaction of theEngineer.CEMENT PLASTER FINISHItem 1027 (a)This item shall consist of furnishing all cement plaster materials, labor, toolsand equipment required in undertaking cement plaster finish as shown on thePlans and accordance with this Specification.Portland cement shall conform with the requirements as defined in item 700,Hydraulic Cement.Fine aggregates shall be clean, washed river sand and free from dirt, clay,organic matter or other deleterious substances.97Clark Development Corporation Proposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)

Doors shall be operated and with provision for manual operation by means <strong>of</strong>hand chain. Accessories needed for the satisfactory performance <strong>of</strong> the doorshall be built-in with the unit.The work executed under this item shall be measured by actual units <strong>of</strong> rollingup door installed at jobsite complete and ready for service. The computed unitshall bear type <strong>of</strong> materials and area <strong>of</strong> opening covered and shall be acceptedby the Engineer.PREPAINTED METAL SHEETSItem 1014 (a)1, 1014 (a)2, 1014 (b) to (d)This item shall consist <strong>of</strong> furnishing all pre-painted metal sheet materials, toolsand equipment, plant including labor required in undertaking the properinstallation complete as shown on the Plans and in accordance with thisSpecification.All pre-painted metal sheet and ro<strong>of</strong>ing accessories shall be oven bakedpainted and shall have an overall thickness with protective coats <strong>of</strong> 0.400mm,true to pr<strong>of</strong>iles indicated on the Plans.Pre-painted rolling sheets shall be fabricated from cold rolled galvanized ironsheets specially tempered steel for extra strength and durability. It shallconform to the material requirements defined in PNS 67:1985Design/color shall be subject to the approval <strong>of</strong> the Architect/Engineer.Pre-painted steel ro<strong>of</strong>ing sheets “long span” for the repair <strong>of</strong> ro<strong>of</strong>ing at Main<strong>Building</strong> shall match the pr<strong>of</strong>ile <strong>of</strong> the existing ro<strong>of</strong>ing.Removal and Re-installation <strong>of</strong> existing Pre-painted long span from the OldMotorpool to <strong>Jacinto</strong> <strong>Building</strong> shall include labor, equipment and accessories.The removal and reinstallation work shall be carefully done to avoid damage.The work done under this item shall be measured by actual area covered orinstalled with pre-painted steel ro<strong>of</strong>ing and accepted to the satisfaction <strong>of</strong> theEngineer/Architect.CERAMIC TILESItem 1018 (a) and (b)This item shall consist <strong>of</strong> furnishing all ceramic tiles, materials, tools andequipment including labor required in undertaking the proper installation <strong>of</strong>96<strong>Clark</strong> Development Corporation <strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!