Doors shall be operated and with provision for manual operation by means ofhand chain. Accessories needed for the satisfactory performance of the doorshall be built-in with the unit.The work executed under this item shall be measured by actual units of rollingup door installed at jobsite complete and ready for service. The computed unitshall bear type of materials and area of opening covered and shall be acceptedby the Engineer.PREPAINTED METAL SHEETSItem 1014 (a)1, 1014 (a)2, 1014 (b) to (d)This item shall consist of furnishing all pre-painted metal sheet materials, toolsand equipment, plant including labor required in undertaking the properinstallation complete as shown on the Plans and in accordance with thisSpecification.All pre-painted metal sheet and roofing accessories shall be oven bakedpainted and shall have an overall thickness with protective coats of 0.400mm,true to profiles indicated on the Plans.Pre-painted rolling sheets shall be fabricated from cold rolled galvanized ironsheets specially tempered steel for extra strength and durability. It shallconform to the material requirements defined in PNS 67:1985Design/color shall be subject to the approval of the Architect/Engineer.Pre-painted steel roofing sheets “long span” for the repair of roofing at MainBuilding shall match the profile of the existing roofing.Removal and Re-installation of existing Pre-painted long span from the OldMotorpool to Jacinto Building shall include labor, equipment and accessories.The removal and reinstallation work shall be carefully done to avoid damage.The work done under this item shall be measured by actual area covered orinstalled with pre-painted steel roofing and accepted to the satisfaction of theEngineer/Architect.CERAMIC TILESItem 1018 (a) and (b)This item shall consist of furnishing all ceramic tiles, materials, tools andequipment including labor required in undertaking the proper installation of96Clark Development Corporation Proposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)
walls and floor tiles as shown on the Plans and in accordance with thisSpecification.Glazed tiles and trims shall have an impervious face of ceramic materials fusedonto the body of the tiles and trims. The glazed surface may be clear white orcolored depending on the color scheme approved by the Engineer. Glazed tilesare used principally for walls.Unglazed tiles shall be hard dense tile of homogeneous composition. Its colorand characteristics are determined by the materials used in the body, themethod of manufacture and the thermal treatment. It is used primarily for floorand walks.Trims are manufactured to match wall tile color, texture and to coordinate withit in dimension.Mortar mix for scratch coat and setting bed shall consist of one part Portlandcement ¼ part lime and 3 parts sand by volume. Surface to receive tile mustbe level, true to elevation, dry, free from dirt, oil and other ointments. Allow atleast seven days curing of scratch coat and setting bed.Installation work shall not be allowed to proceed until unsatisfactory conditionsare corrected.Tiles shall have laid in place for at least 24 hours before grouting of the jointsis started. Grouting mortar shall be white Portland cement or blended withpigments to acquire the color appropriate for the ceramic tile.All works performed under this item shall be measured in square meters forareas actually laid with ceramic tiles and accepted to the satisfaction of theEngineer.CEMENT PLASTER FINISHItem 1027 (a)This item shall consist of furnishing all cement plaster materials, labor, toolsand equipment required in undertaking cement plaster finish as shown on thePlans and accordance with this Specification.Portland cement shall conform with the requirements as defined in item 700,Hydraulic Cement.Fine aggregates shall be clean, washed river sand and free from dirt, clay,organic matter or other deleterious substances.97Clark Development Corporation Proposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)
- Page 48 and 49: 2.2. If sectional completion is spe
- Page 50 and 51: particularly when they shall requir
- Page 52 and 53: Procuring Entity shall rescind this
- Page 54 and 55: and/or intended purpose of the same
- Page 56 and 57: 15.2. The Contractor shall provide
- Page 58 and 59: 16.5. All materials on the Site, Pl
- Page 60 and 61: 18.5. When persons from either part
- Page 62 and 63: (i) Employment of competent technic
- Page 64 and 65: decision was wrongly taken, the dec
- Page 66 and 67: 27. Right to Vary27.1. The Procurin
- Page 68 and 69: 32. Management Conferences32.1. Eit
- Page 70 and 71: 38. Uncorrected Defects38.1. The Pr
- Page 72 and 73: (c)Include the valuations of approv
- Page 74 and 75: (a)(b)(c)(d)(e)If the Procuring Ent
- Page 76 and 77: unless there are justifiable reason
- Page 78 and 79: consideration and the validity of t
- Page 80 and 81: GCC ClauseSpecial Conditions of Con
- Page 82 and 83: Section VI. Technical Specification
- Page 84 and 85: Item 800 (b) Cleaning and Scrubbing
- Page 86 and 87: in the approved Plan shall undertak
- Page 88 and 89: The concrete materials shall be pro
- Page 90 and 91: The quantity of metal structures to
- Page 92 and 93: Valves for water supply system shal
- Page 94 and 95: High Pressure Plastic Laminate comp
- Page 96 and 97: ALUMINUM GLASS WINDOWS (Supply and
- Page 100 and 101: Mortar mixture shall be freshly pre
- Page 102 and 103: portion(s) shall not start until cl
- Page 104 and 105: All panel board and metallic boxes
- Page 106 and 107: Panel boards shall conform to the s
- Page 108 and 109: Section VII. DrawingsSee attached10
- Page 110 and 111: Section VIII. Bill of Quantities108
- Page 112 and 113: Bid FormDate: ___________________IA
- Page 114 and 115: Form of Contract AgreementTHIS Cont
- Page 116 and 117: A C K N O W L E D G E M E N TREPUBL
- Page 118 and 119: 6. [Name of Bidder] is authorizing
- Page 120 and 121: Any one of the Following:o Computat
- Page 122 and 123: Sample Forms of Eligibility, Techni
- Page 124 and 125: Standard Form Number: SF-INFR-16Sta
- Page 126 and 127: Standard Form Number: SF-INFR-20Rev
- Page 128 and 129: we undertake to pay to the Entity u
- Page 130 and 131: 2) if the Principal does not accept
- Page 132 and 133: Standard Form Number: SF-INFR-45Rev
- Page 134 and 135: Standard Form Number: SF-INFR-46Rev
- Page 136 and 137: Standard Form Number: SF-INFR-47Rev
- Page 138 and 139: Standard Form Number: SF-INFR-48Qua
- Page 140 and 141: DAYWORK SCHEDULEPROJECT : Proposed
Doors shall be operated and with provision for manual operation by means <strong>of</strong>hand chain. Accessories needed for the satisfactory performance <strong>of</strong> the doorshall be built-in with the unit.The work executed under this item shall be measured by actual units <strong>of</strong> rollingup door installed at jobsite complete and ready for service. The computed unitshall bear type <strong>of</strong> materials and area <strong>of</strong> opening covered and shall be acceptedby the Engineer.PREPAINTED METAL SHEETSItem 1014 (a)1, 1014 (a)2, 1014 (b) to (d)This item shall consist <strong>of</strong> furnishing all pre-painted metal sheet materials, toolsand equipment, plant including labor required in undertaking the properinstallation complete as shown on the Plans and in accordance with thisSpecification.All pre-painted metal sheet and ro<strong>of</strong>ing accessories shall be oven bakedpainted and shall have an overall thickness with protective coats <strong>of</strong> 0.400mm,true to pr<strong>of</strong>iles indicated on the Plans.Pre-painted rolling sheets shall be fabricated from cold rolled galvanized ironsheets specially tempered steel for extra strength and durability. It shallconform to the material requirements defined in PNS 67:1985Design/color shall be subject to the approval <strong>of</strong> the Architect/Engineer.Pre-painted steel ro<strong>of</strong>ing sheets “long span” for the repair <strong>of</strong> ro<strong>of</strong>ing at Main<strong>Building</strong> shall match the pr<strong>of</strong>ile <strong>of</strong> the existing ro<strong>of</strong>ing.Removal and Re-installation <strong>of</strong> existing Pre-painted long span from the OldMotorpool to <strong>Jacinto</strong> <strong>Building</strong> shall include labor, equipment and accessories.The removal and reinstallation work shall be carefully done to avoid damage.The work done under this item shall be measured by actual area covered orinstalled with pre-painted steel ro<strong>of</strong>ing and accepted to the satisfaction <strong>of</strong> theEngineer/Architect.CERAMIC TILESItem 1018 (a) and (b)This item shall consist <strong>of</strong> furnishing all ceramic tiles, materials, tools andequipment including labor required in undertaking the proper installation <strong>of</strong>96<strong>Clark</strong> Development Corporation <strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)