10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Perimeter Angle or Perimeter Channel is fixed to the walls around the edge <strong>of</strong>the room providing a location for the Ceiling Furring Channel. Primary 1.0mmthick Channel is suspended at a maximum <strong>of</strong> 1200mm centres using AdjustableRod Sets.The work commenced under this item shall be measured as ceiling area insquare meter. The quantity determined shall be paid for at the Contract UnitPrice which price constitutes full compensation including labor, materials, toolsand equipment.HARDWAREThis item shall consist <strong>of</strong> furnishing and installing all building hardwarerequired to ensure rigidity <strong>of</strong> joints/connections <strong>of</strong> the different parts <strong>of</strong> thestructure such as doors, windows, cabinets and other similar operating parts asindicated on the plans and in accordance with these specifications.All rough hardware such as nails, screws, lag screws, bolts and other relatedfasteners required for work shall be first class quality.All finishing hardware consisting <strong>of</strong> Cylindrical lockset polished brass, Keyoutside and thumb turn inside with high security 5-pin tumbler cylinder (E-Zset or Approved Equal), 4” x 4” Polished brass loose pin ball bearing type withqueen tip door hinge, Door closer with hold-open function open beyond 85dthe door will remain open, closing speed is adjustable faster or slower,reversible to right or left hand swing (E-Z set or Approved Equal)Stair Noising shall be heavy duty brass type or any approved equal.All hardware shall be installed in neat workmanship manner following themanufacturers’ instruction manual to fit details as indicated on the plans.All hardware actually installed shall be measured and determined by number <strong>of</strong>pieces or units ready for service as provided in the bill <strong>of</strong> quantities accepted tothe satisfaction <strong>of</strong> the Engineer.The quantities to be paid for hardware shall be the number <strong>of</strong> material in piece(each)/set installed and accepted by the Engineer.Item 1004 (b) to (d)The work under these items shall consist <strong>of</strong> furnishing all required materials,tools, equipment and labor all operations necessary for the satisfactorycompletion <strong>of</strong> works in strict accord with applicable drawings, details and theseSpecifications.91<strong>Clark</strong> Development Corporation <strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!