The quantity <strong>of</strong> metal structures to be paid for will be the final quantity in kilosplaced and accepted in the completed structure.Part – C -FINISHINGTERMITE CONTROL WORKSItem 1000 Soil PoisoningThe work includes furnishing <strong>of</strong> skilled labor (certified pesticide applicator dulylicensed by fertilizer and pesticide authority), chemical, tools, equipments,supervision and other related works necessary to complete the program hereinrecommended and described.Before any termite control work is started, thorough examination <strong>of</strong> the site shallbe undertaken so that the appropriate method <strong>of</strong> soil poisoning can be applied.Treatment <strong>of</strong> the soil on the exterior sides <strong>of</strong> the foundation walls, grade beamsand similar structures shall be done prior to final grading and planting orlandscaping work to avoid disturbance <strong>of</strong> the toxicant barriers by such operations.Areas to be covered by concrete slab shall be treated before placement <strong>of</strong>granular fill used as capillary water barrier at a rate <strong>of</strong> 12 liters per squre meterwith Type 1 working solution after it has been compacted and set to requiredelevation.Use 30 ml. <strong>of</strong> concentrated chemical per 1 (one) liter <strong>of</strong> water (dilution) or 1 liter<strong>of</strong> concentrated chemical per 33.33 liter <strong>of</strong> water. Chemical to be used shall be100% efficacy in 5 (five) years upon completion <strong>of</strong> work.STORM DRAINAGE AND SEWERAGE SYSTEMAll sanitary/plumbing works shall be done under the supervision <strong>of</strong> aMechanical/Sanitary Engineer and in strict accordance with these specificationsand <strong>of</strong> the methods as prescribed by the latest edition <strong>of</strong> the Philippine PlumbingCode, Sanitary Code <strong>of</strong> the Philippine and the Mechanical Code <strong>of</strong> the Philippines.All items not specifically mentioned in the specifications or noted on the drawingsbut which are obviously necessary to make a complete working installation shallbe included.Item 1001.2 (a) to (d) PVC Pipes and FittingsThis item shall consist <strong>of</strong> furnishing all materials, equipment and labor for thecomplete installation <strong>of</strong> all sanitary sewer piping and accessories including hangerand supports.88<strong>Clark</strong> Development Corporation <strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!