10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Structural steel shall conform to American Society <strong>of</strong> Testing Materials (ASTM) A-36, with Fy <strong>of</strong> 248 Mpa. Electrodes for welding shall conform to the latest coderequirements <strong>of</strong> the American Welding Society (AWS).Surfaces to be welded shall be free from loose scale, slag, rust, grease, paint andany other foreign material. All butt welds shall be full penetration welds.Joint surfaces shall be free from fins and tears. Any shop paint on surfacesadjacent to joints to be field welded shall be wire brushed to reduce the paintfilm to a minimum.Thermal cutting and welding shall be done in accordance with the latest Standardcode for "Welding in <strong>Building</strong> Construction" <strong>of</strong> the American Welding Society(AWS).No permanent welding shall be done until as much <strong>of</strong> the structure as will bestiffened thereby has been properly aligned.Painting shall conform to the requirements <strong>of</strong> item 1032. Apply one (1) coat <strong>of</strong>metal primer paint and two (2) coats <strong>of</strong> quick drying enamel paint.The quantity <strong>of</strong> metal structures to be paid for will be the final quantity in kilosfor item (a) & (b); in Square Meter for item (c); and each for item (f) placed andaccepted in the completed structure.Item 403(d) & (e) Anchor Bolts and Expansion BoltsThe work shall consist <strong>of</strong> furnishing, fabricating, and installation <strong>of</strong> anchor bolts,expansion bolts including nut and washer in accordance with this specification andin conformance to the approved plans. All bolts shall conform to ASTM A325requirement.Item 403(g) Removal, Re-fabrication, and Reinstallation <strong>of</strong> ExistingSteel Trusses/PurlinsThe work shall consist <strong>of</strong> furnishing labor, tools and equipment for the removal, refabricating,reinstallation and repainting <strong>of</strong> the existing steel trusses and purlins atthe old motor pool shed located along J. Abad Santos Avenue in accordance withthis specification and in conformance to the approved plans.The dismantling and removal works shall be carefully done with appropriateequipment so as to avoid peripheral damaged. Re-fabrication and reinstallationshall be in accordance with item 403 (a). Repainting shall conform to therequirements <strong>of</strong> item 1032.87<strong>Clark</strong> Development Corporation <strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!