10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The concrete materials shall be proportioned in accordance with therequirements for each class <strong>of</strong> concrete as specified in Table 405.2 (3,000 psimin. compressive strength for class “A” concrete) Composition and Strength <strong>of</strong>Concrete for Use in Structures <strong>of</strong> DPWH Standard Specifications 2004.Concrete shall have a consistency such that it will be workable in the requiredposition. It shall be <strong>of</strong> such a consistency that it will flow around reinforcing steelbut individual particles <strong>of</strong> the coarse aggregate when isolated shall show acoating <strong>of</strong> mortar containing its appropriate amount <strong>of</strong> sand.The quantity <strong>of</strong> structural concrete to be paid for will be the final quantity inCubic Meter placed and accepted in the completed structure.PART B2 -METAL STRUCTURESItem 403(a), (b), (c) & (f) Miscellaneous and Structural MetalsThe work shall consist <strong>of</strong> furnishing, fabricating, hauling, erecting, welding andpainting <strong>of</strong> tubular bars, purlins, angular bar, metal plates, sag rod, welded wire,and other miscellaneous and structural metals in accordance with this specificationand in conformance to the approved plans.General Notes and typical structural details shall apply to all drawings unlessotherwise shown or noted. Features <strong>of</strong> construction shown are typical and shallapply generally throughout for similar conditions. Modify typical details as requiredto meet special conditions.The contractor shall examine the drawings and shall notify the Engineer/Architect<strong>of</strong> any discrepancies he may find before proceeding with the work or duringconstruction.It shall be the contractor's responsibility to provide adequate shoring and bracing<strong>of</strong> the structure for all loads that may be imposed during construction.All materials and workmanship shall conform to the latest applicable standards orspecifications. All works shall conform to the best practice prevailing in the varioustrades.All construction and workmanship shall be subject to inspection, examination andtesting by the Engineer/Architect. The Engineer/Architect shall have the right toreject defective materials and workmanship or require its correction.The contractor will be responsible for the coordination <strong>of</strong> work among the varioustrades as necessary to avoid conflicts and to insure the installation <strong>of</strong> all workwithin the available space.86<strong>Clark</strong> Development Corporation <strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!