Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

10.07.2015 Views

Section VI. Technical Specifications andScope of Work80Clark Development Corporation Proposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)

PROJECT TITLE :Proposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and MaintenanceArea)LOCATION : Pagkakaisa Street, Clark Freeport Zone, PhilippinesSCOPE OF WORKThe construction procedures shall be done in accordance with the DPWH StandardSpecifications Volume III, and in full compliance with the approved plans andspecifications.Pertinent notes appearing in the Contract Plans or Drawings shall also be considered aspart and parcel of the technical specifications. Such notes shall take precedence over theGeneral SpecificationsPART A – EARTHWORKItem 800 (a) Site Clearing and Grubbing of Surrounding AreaThis item shall consist of clearing and grubbing, removing and disposing allvegetation and debris as designated in the Contract, except those objects that aredesignated to remain in place or are to be removed in consonance with otherprovisions of this Specification. The work shall also include the preservation frominjury or defacement of all objects designated to remain.All surface objects and all trees, stumps, roots and other protruding obstructions,not designated to remain, shall be cleared and/or grubbed, including mowing asrequired.The holes resulting from grubbing operations, where directed by the Engineer,shall be filled with approved materials which shall be deposited and compacted tothe same dry density as that of the adjoining soil.The work to be paid for shall be the number of hectares and fractions thereofacceptably cleared and grubbed within the limits indicated on the Plans or as maybe adjusted in field staking by the Engineer. Areas not within the clearing andgrubbing limits shown on the plans or not staked for clearing and grubbing will notbe measured for payment.81Clark Development Corporation Proposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)

PROJECT TITLE :<strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and MaintenanceArea)LOCATION : Pagkakaisa Street, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>, PhilippinesSCOPE OF WORKThe construction procedures shall be done in accordance with the DPWH StandardSpecifications Volume III, and in full compliance with the approved plans andspecifications.Pertinent notes appearing in the Contract Plans or Drawings shall also be considered aspart and parcel <strong>of</strong> the technical specifications. Such notes shall take precedence over theGeneral SpecificationsPART A – EARTHWORKItem 800 (a) Site Clearing and Grubbing <strong>of</strong> Surrounding AreaThis item shall consist <strong>of</strong> clearing and grubbing, removing and disposing allvegetation and debris as designated in the Contract, except those objects that aredesignated to remain in place or are to be removed in consonance with otherprovisions <strong>of</strong> this Specification. The work shall also include the preservation frominjury or defacement <strong>of</strong> all objects designated to remain.All surface objects and all trees, stumps, roots and other protruding obstructions,not designated to remain, shall be cleared and/or grubbed, including mowing asrequired.The holes resulting from grubbing operations, where directed by the Engineer,shall be filled with approved materials which shall be deposited and compacted tothe same dry density as that <strong>of</strong> the adjoining soil.The work to be paid for shall be the number <strong>of</strong> hectares and fractions there<strong>of</strong>acceptably cleared and grubbed within the limits indicated on the Plans or as maybe adjusted in field staking by the Engineer. Areas not within the clearing andgrubbing limits shown on the plans or not staked for clearing and grubbing will notbe measured for payment.81<strong>Clark</strong> Development Corporation <strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!