10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12.5 In case <strong>of</strong> permanent structures, such as buildings <strong>of</strong> types 4 and 5 asclassified under the National <strong>Building</strong> Code <strong>of</strong> the Philippines and otherstructures made <strong>of</strong> steel, iron, or concrete which comply with relevantstructural codes (e.g., DPWH Standard Specifications), such as, but notlimited to, steel/concrete bridges, flyovers, aircraft movement areas, ports,dams, tunnels, filtration and treatment plants, sewerage systems, powerplants, transmission and communication towers, railway system, and othersimilar permanent structures: Fifteen (15) years.13. “No additional provision.” or, if the Contractor is a joint venture, “Allpartners to the joint venture shall be jointly and severally liable to theProcuring Entity.”18.3 (h)(i) No further instructions.21.2. The Arbiter is:Construction Industry Arbitration Commission4F, Jupiter <strong>Building</strong>56 Jupiter Street, Bel Air Makati City29.1. Day works are applicable at the rate shown in the Contractor’s original Bid.31.1. The Contractor shall submit the Program <strong>of</strong> Work to the Procuring Entity’sRepresentative within seven (7) calendar days <strong>of</strong> delivery <strong>of</strong> the Notice toProceed. The Program <strong>of</strong> Work should include the As-Staked Plans and As-Staked Quantities for all items <strong>of</strong> work for the project.31.3. The period between Program <strong>of</strong> Work updates is seven (7) calendar days.The amount to be withheld for late submission <strong>of</strong> an updated Program <strong>of</strong>Work is 1% <strong>of</strong> every Progress Billing <strong>of</strong> the Contractor.34.3. The Funding Source is the Government <strong>of</strong> the Philippines.39.1. The amount <strong>of</strong> the advance payment is 15% <strong>of</strong> the Contract Amount.40.1. No further Instructions.51.1. The date by which operating and maintenance manuals are required iswithin seven (7) working days upon satisfactory completion.51.2.The date by which “as built” drawings are required is within seven (7)working days upon satisfactory completion.The amount to be withheld for failing to produce “as built” drawingsand/or operating and maintenance manuals by the date required isequivalent to final collection/billing & or 10% <strong>of</strong> the final Contract Costwhichever is higher.79<strong>Clark</strong> Development Corporation <strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!