Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

GCC ClauseSpecial Conditions <strong>of</strong> Contract1.16 The Intended Completion Date is within 150 Calendar Days uponeffective date <strong>of</strong> Contract. (The effective date <strong>of</strong> contract is within seven(7) calendar days upon receipt <strong>of</strong> Notice to Proceed).1.21 The Procuring Entity is <strong>Clark</strong> Development Corporation Bldg. 2122 E.Quirino St. CDC Corporate Center, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>, Philippines.1.22 The Procuring Entity’s Representative isAtty. Felipe Antonio B. RemolloPresident and Chief Executive Officer<strong>Clark</strong> Development CorporationBldg. 2122, E. Quirino Avenue, corner Carlos P. Garcia St.CDC Corporate Center, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>, Philippines 2023.Tel. No. (045)599-9000 local 902The duly alternate representative is Engr. Rene S. Arcilla1.23 The Site is located at Pagkakaisa Street, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>, Philippines2023 and as defined in drawings.1.27 The Start Date is within seven (7) calendar days upon receipt <strong>of</strong> theNotice to Proceed.1.30The Works involves the construction <strong>of</strong> new road and drainage alongIndustrial Estate 5.2.2 No further instructions.5.1. The Procuring Entity shall give possession <strong>of</strong> all parts <strong>of</strong> the Site to theContractor upon receipt <strong>of</strong> Notice to Proceed.6.5. The Contractor shall employ the following Key Personnel: [List keypersonnel by name and designation]7.4(c)No further instructions.7.1. No further instructions.7.7 No further instructions.8.1 No further instructions.10 The site investigation reports are: none12.3 No further instructions.78<strong>Clark</strong> Development Corporation <strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!