Proposed Renovation of Former Jacinto Building - Clark Freeport Zone
Proposed Renovation of Former Jacinto Building - Clark Freeport Zone
Proposed Renovation of Former Jacinto Building - Clark Freeport Zone
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
GCC ClauseSpecial Conditions <strong>of</strong> Contract1.16 The Intended Completion Date is within 150 Calendar Days uponeffective date <strong>of</strong> Contract. (The effective date <strong>of</strong> contract is within seven(7) calendar days upon receipt <strong>of</strong> Notice to Proceed).1.21 The Procuring Entity is <strong>Clark</strong> Development Corporation Bldg. 2122 E.Quirino St. CDC Corporate Center, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>, Philippines.1.22 The Procuring Entity’s Representative isAtty. Felipe Antonio B. RemolloPresident and Chief Executive Officer<strong>Clark</strong> Development CorporationBldg. 2122, E. Quirino Avenue, corner Carlos P. Garcia St.CDC Corporate Center, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>, Philippines 2023.Tel. No. (045)599-9000 local 902The duly alternate representative is Engr. Rene S. Arcilla1.23 The Site is located at Pagkakaisa Street, <strong>Clark</strong> <strong>Freeport</strong> <strong>Zone</strong>, Philippines2023 and as defined in drawings.1.27 The Start Date is within seven (7) calendar days upon receipt <strong>of</strong> theNotice to Proceed.1.30The Works involves the construction <strong>of</strong> new road and drainage alongIndustrial Estate 5.2.2 No further instructions.5.1. The Procuring Entity shall give possession <strong>of</strong> all parts <strong>of</strong> the Site to theContractor upon receipt <strong>of</strong> Notice to Proceed.6.5. The Contractor shall employ the following Key Personnel: [List keypersonnel by name and designation]7.4(c)No further instructions.7.1. No further instructions.7.7 No further instructions.8.1 No further instructions.10 The site investigation reports are: none12.3 No further instructions.78<strong>Clark</strong> Development Corporation <strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)