consideration and the validity of the Performance Security shall becorrespondingly extended.48. Price AdjustmentExcept for extraordinary circumstances as determined by NEDA and approvedby the GPPB, no price adjustment shall be allowed. Nevertheless, in caseswhere the cost of the awarded contract is affected by any applicable newlaws, ordinances, regulations, or other acts of the GOP, promulgated after thedate of bid opening, a contract price adjustment shall be made or appropriaterelief shall be applied on a no loss-no gain basis.49. CompletionThe Contractor shall request the Procuring Entity’s Representative to issue acertificate of Completion of the Works, and the Procuring Entity’sRepresentative will do so upon deciding that the work is completed.50. Taking OverThe Procuring Entity shall take over the Site and the Works within seven (7)days from the date the Procuring Entity’s Representative issues a certificate ofCompletion.51. Operating and Maintenance Manuals51.1. If “as built” Drawings and/or operating and maintenance manuals arerequired, the Contractor shall supply them by the dates stated in theSCC.51.2. If the Contractor does not supply the Drawings and/or manuals by thedates stated in the SCC, or they do not receive the Procuring Entity’sRepresentative’s approval, the Procuring Entity’s Representative shallwithhold the amount stated in the SCC from payments due to theContractor.76Clark Development CorporationSection IV General Conditions of ContractProposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)
Section V. Special Conditions of Contract(SCC)77Clark Development CorporationSection IV General Conditions of ContractProposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)
- Page 28 and 29: administrative, civil, and criminal
- Page 30 and 31: 27. Detailed Evaluation and Compari
- Page 32 and 33: Calculated Bid to make a similar de
- Page 34 and 35: (a)Submission of the following docu
- Page 36 and 37: 33. Notice to Proceed33.1. Within t
- Page 38 and 39: Bid Data SheetITBClause1.1. The PRO
- Page 40 and 41: 14.2. No further instructions.15.4.
- Page 42 and 43: Section IV. General Conditions ofCo
- Page 44 and 45: 27.RIGHT TO VARY...................
- Page 46 and 47: 1.13. The Defects Liability Period
- Page 48 and 49: 2.2. If sectional completion is spe
- Page 50 and 51: particularly when they shall requir
- Page 52 and 53: Procuring Entity shall rescind this
- Page 54 and 55: and/or intended purpose of the same
- Page 56 and 57: 15.2. The Contractor shall provide
- Page 58 and 59: 16.5. All materials on the Site, Pl
- Page 60 and 61: 18.5. When persons from either part
- Page 62 and 63: (i) Employment of competent technic
- Page 64 and 65: decision was wrongly taken, the dec
- Page 66 and 67: 27. Right to Vary27.1. The Procurin
- Page 68 and 69: 32. Management Conferences32.1. Eit
- Page 70 and 71: 38. Uncorrected Defects38.1. The Pr
- Page 72 and 73: (c)Include the valuations of approv
- Page 74 and 75: (a)(b)(c)(d)(e)If the Procuring Ent
- Page 76 and 77: unless there are justifiable reason
- Page 80 and 81: GCC ClauseSpecial Conditions of Con
- Page 82 and 83: Section VI. Technical Specification
- Page 84 and 85: Item 800 (b) Cleaning and Scrubbing
- Page 86 and 87: in the approved Plan shall undertak
- Page 88 and 89: The concrete materials shall be pro
- Page 90 and 91: The quantity of metal structures to
- Page 92 and 93: Valves for water supply system shal
- Page 94 and 95: High Pressure Plastic Laminate comp
- Page 96 and 97: ALUMINUM GLASS WINDOWS (Supply and
- Page 98 and 99: Doors shall be operated and with pr
- Page 100 and 101: Mortar mixture shall be freshly pre
- Page 102 and 103: portion(s) shall not start until cl
- Page 104 and 105: All panel board and metallic boxes
- Page 106 and 107: Panel boards shall conform to the s
- Page 108 and 109: Section VII. DrawingsSee attached10
- Page 110 and 111: Section VIII. Bill of Quantities108
- Page 112 and 113: Bid FormDate: ___________________IA
- Page 114 and 115: Form of Contract AgreementTHIS Cont
- Page 116 and 117: A C K N O W L E D G E M E N TREPUBL
- Page 118 and 119: 6. [Name of Bidder] is authorizing
- Page 120 and 121: Any one of the Following:o Computat
- Page 122 and 123: Sample Forms of Eligibility, Techni
- Page 124 and 125: Standard Form Number: SF-INFR-16Sta
- Page 126 and 127: Standard Form Number: SF-INFR-20Rev
Section V. Special Conditions <strong>of</strong> Contract(SCC)77<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> Contract<strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)