arisen, delivered to the Procuring Entity notices in order that it couldhave investigated them at that time. Failure to provide such noticeshall constitute a waiver by the Contractor <strong>of</strong> any claim. Upon receipt<strong>of</strong> full and detailed particulars, the Procuring Entity shall examine thefacts and extent <strong>of</strong> the delay and shall extend the contract timecompleting the contract work when, in the Procuring Entity’s opinion,the findings <strong>of</strong> facts justify an extension.47.2. No extension <strong>of</strong> contract time shall be granted the Contractor due to(a) ordinary unfavorable weather conditions and (b) inexcusable failureor negligence <strong>of</strong> Contractor to provide the required equipment,supplies or materials.47.3. Extension <strong>of</strong> contract time may be granted only when the affectedactivities fall within the critical path <strong>of</strong> the PERT/CPM network.47.4. No extension <strong>of</strong> contract time shall be granted when the reason givento support the request for extension was already considered in thedetermination <strong>of</strong> the original contract time during the conduct <strong>of</strong>detailed engineering and in the preparation <strong>of</strong> the contract documentsas agreed upon by the parties before contract perfection.47.5. Extension <strong>of</strong> contract time shall be granted for rainy/unworkable daysconsidered unfavorable for the prosecution <strong>of</strong> the works at the site,based on the actual conditions obtained at the site, in excess <strong>of</strong> thenumber <strong>of</strong> rainy/unworkable days pre-determined by the ProcuringEntity in relation to the original contract time during the conduct <strong>of</strong>detailed engineering and in the preparation <strong>of</strong> the contract documentsas agreed upon by the parties before contract perfection, and/or forequivalent period <strong>of</strong> delay due to major calamities such asexceptionally destructive typhoons, floods and earthquakes, andepidemics, and for causes such as non-delivery on time <strong>of</strong> materials,working drawings, or written information to be furnished by theProcuring Entity, non-acquisition <strong>of</strong> permit to enter private propertieswithin the right-<strong>of</strong>-way resulting in complete paralyzation <strong>of</strong>construction activities, and other meritorious causes as determined bythe Procuring Entity’s Representative and approved by the Head <strong>of</strong> theProcuring Entity. Shortage <strong>of</strong> construction materials, general laborstrikes, and peace and order problems that disrupt constructionoperations through no fault <strong>of</strong> the Contractor may be considered asadditional grounds for extension <strong>of</strong> contract time provided they arepublicly felt and certified by appropriate government agencies such asDTI, DOLE, DILG, and DND, among others. The written consent <strong>of</strong>bondsmen must be attached to any request <strong>of</strong> the Contractor forextension <strong>of</strong> contract time and submitted to the Procuring Entity for75<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> Contract<strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!