10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

corrections, and the specific duration/time to fully complete the projectconsidering the approved remaining contract time. This, however, shall notpreclude the claim <strong>of</strong> the Procuring Entity for liquidated damages.45. Suspension <strong>of</strong> Work45.1. The Procuring Entity shall have the authority to suspend the workwholly or partly by written order for such period as may be deemednecessary, due to force majeure or any fortuitous events or for failureon the part <strong>of</strong> the Contractor to correct bad conditions which areunsafe for workers or for the general public, to carry out valid ordersgiven by the Procuring Entity or to perform any provisions <strong>of</strong> thecontract, or due to adjustment <strong>of</strong> plans to suit field conditions as foundnecessary during construction. The Contractor shall immediatelycomply with such order to suspend the work wholly or partly.45.2. The Contractor or its duly authorized representative shall have theright to suspend work operation on any or all projects/activities alongthe critical path <strong>of</strong> activities after fifteen (15) calendar days from date<strong>of</strong> receipt <strong>of</strong> written notice from the Contractor to the districtengineer/regional director/consultant or equivalent <strong>of</strong>ficial, as the casemay be, due to the following:(a)(b)(c)(d)(e)There exist right-<strong>of</strong>-way problems which prohibit the Contractorfrom performing work in accordance with the approvedconstruction schedule.Requisite construction plans which must be owner-furnished arenot issued to the contractor precluding any work called for bysuch plans.Peace and order conditions make it extremely dangerous, if notpossible, to work. However, this condition must be certified inwriting by the Philippine National Police (PNP) station which hasresponsibility over the affected area and confirmed by theDepartment <strong>of</strong> Interior and Local Government (DILG) RegionalDirector.There is failure on the part <strong>of</strong> the Procuring Entity to delivergovernment-furnished materials and equipment as stipulated inthe contract.Delay in the payment <strong>of</strong> Contractor’s claim for progress billingbeyond forty-five (45) calendar days from the time theContractor’s claim has been certified to by the procuring entity’sauthorized representative that the documents are complete73<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> Contract<strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!