10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

work has a defect and the test shows that it does, the Contractor shallpay for the test and any samples. If there is no defect, the test shallbe a Compensation Event.34.3. The Contractor shall permit the Funding Source named in the SCC toinspect the Contractor’s accounts and records relating to theperformance <strong>of</strong> the Contractor and to have them audited by auditorsappointed by the Funding Source, if so required by the FundingSource.35. Identifying DefectsThe Procuring Entity’s Representative shall check the Contractor’s work andnotify the Contractor <strong>of</strong> any defects that are found. Such checking shall notaffect the Contractor’s responsibilities. The Procuring Entity’s Representativemay instruct the Contractor to search uncover defects and test any work thatthe Procuring Entity’s Representative considers below standards anddefective.36. Cost <strong>of</strong> RepairsLoss or damage to the Works or Materials to be incorporated in the Worksbetween the Start Date and the end <strong>of</strong> the Defects Liability Periods shall beremedied by the Contractor at the Contractor’s cost if the loss or damagearises from the Contractor’s acts or omissions.37. Correction <strong>of</strong> Defects37.1. The Procuring Entity’s Representative shall give notice to theContractor <strong>of</strong> any defects before the end <strong>of</strong> the Defects Liability Period,which is One (1) year from project completion up to final acceptanceby the Procuring Entity’s.37.2. Every time notice <strong>of</strong> a defect is given, the Contractor shall correct thenotified defect within the length <strong>of</strong> time specified in the ProcuringEntity’s Representative’s notice.37.3. The Contractor shall correct the defects which he notices himselfbefore the end <strong>of</strong> the Defects Liability Period.37.4. The Procuring Entity shall certify that all defects have been corrected.If the Procuring Entity considers that correction <strong>of</strong> a defect is notessential, he can request the Contractor to submit a quotation for thecorresponding reduction in the Contract Price. If the Procuring Entityaccepts the quotation, the corresponding change in the SCC is aVariation.67<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> Contract<strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!