10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(i) Employment <strong>of</strong> competent technical personnel,competent engineers and/or work supervisors;(ii)(iii)(iv)(v)Provision <strong>of</strong> warning signs and barricades in accordancewith approved plans and specifications and contractprovisions;Stockpiling in proper places <strong>of</strong> all materials and removalfrom the project site <strong>of</strong> waste and excess materials,including broken pavement and excavated debris inaccordance with approved plans and specifications andcontract provisions;Deployment <strong>of</strong> committed equipment, facilities, supportstaff and manpower; andRenewal <strong>of</strong> the effectivity dates <strong>of</strong> the performancesecurity after its expiration during the course <strong>of</strong> contractimplementation.(c)(d)Assignment and subcontracting <strong>of</strong> the contract or any partthere<strong>of</strong> or substitution <strong>of</strong> key personnel named in the proposalwithout prior written approval by the procuring entity.Poor performance by the contractor or unsatisfactory qualityand/or progress <strong>of</strong> work arising from his fault or negligence asreflected in the Constructor's Performance Evaluation System(“CPES”) rating sheet. In the absence <strong>of</strong> the CPES rating sheet,the existing performance monitoring system <strong>of</strong> the procuringentity shall be applied. Any <strong>of</strong> the following acts by theconstructor shall be construed as poor performance:(i)(ii)Negative slippage <strong>of</strong> 15% and above within the criticalpath <strong>of</strong> the project due entirely to the fault or negligence<strong>of</strong> the contractor; andQuality <strong>of</strong> materials and workmanship not complying withthe approved specifications arising from the contractor'sfault or negligence.(e)Willful or deliberate abandonment or non-performance <strong>of</strong> theproject or contract by the contractor resulting to substantialbreach there<strong>of</strong> without lawful and/or just cause.In addition to the penalty <strong>of</strong> suspension, the performance securityposted by the contractor shall also be forfeited.60<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> Contract<strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!