10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

18.5. When persons from either party to this Contract gives notice <strong>of</strong> afundamental breach to the Procuring Entity’s Representative in orderto terminate the existing contract for a cause other than those listedunder GCC Clause 18.3., the Procuring Entity’s Representative shalldecide whether the breach is fundamental or not.18.6. If this Contract is terminated, the Contractor shall stop workimmediately, make the Site safe and secure, and leave the Site as soonas reasonably possible.19. Procedures for Termination <strong>of</strong> Contracts19.1. The following provisions shall govern the procedures for thetermination <strong>of</strong> this Contract:(a)(b)Upon receipt <strong>of</strong> a written report <strong>of</strong> acts or causes which mayconstitute ground(s) for termination as aforementioned, or uponits own initiative, the Implementing Unit shall, within a period <strong>of</strong>seven (7) calendar days, verify the existence <strong>of</strong> such ground(s)and cause the execution <strong>of</strong> a Verified Report, with all relevantevidence attached;Upon recommendation by the Procuring Entity, the Head <strong>of</strong> theProcuring Entity shall terminate this Contract only by a writtennotice to the Contractor conveying the termination <strong>of</strong> thisContract. The notice shall state:(i)(ii)(iii)(iv)that this Contract is being terminated for any <strong>of</strong> theground(s) afore-mentioned, and a statement <strong>of</strong> the actsthat constitute the ground(s) constituting the same;the extent <strong>of</strong> termination, whether in whole or in part;an instruction to the Contractor to show cause as to whythis Contract should not be terminated; andSpecial instructions <strong>of</strong> the Procuring Entity, if any.The Notice to Terminate shall be accompanied by a copy <strong>of</strong> theVerified Report;(c)Within a period <strong>of</strong> seven (7) calendar days from receipt <strong>of</strong> theNotice <strong>of</strong> Termination, the Contractor shall submit to the Head<strong>of</strong> the Procuring Entity a verified position paper stating why thecontract should not be terminated. If the Contractor fails toshow cause after the lapse <strong>of</strong> the seven (7) day period, either58<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> Contract<strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!