Proposed Renovation of Former Jacinto Building - Clark Freeport Zone
Proposed Renovation of Former Jacinto Building - Clark Freeport Zone Proposed Renovation of Former Jacinto Building - Clark Freeport Zone
2.2. If sectional completion is specified in the SCC, references in theConditions of Contract to the Works, the Completion Date, and theIntended Completion Date apply to any Section of the Works (other thanreferences to the Completion Date and Intended Completion Date forthe whole of the Works).3. Governing Language and Law3.1. This Contract has been executed in the English language, which shallbe the binding and controlling language for all matters relating to themeaning or interpretation of this Contract. All correspondence andother documents pertaining to this Contract which are exchanged bythe parties shall be written in English.3.2. This Contract shall be interpreted in accordance with the laws of theRepublic of the Philippines.4. CommunicationsCommunications between parties that are referred to in the Conditions shallbe effective only when in writing. A notice shall be effective only when it isreceived by the concerned party.5. Possession of Site5.1. On the date specified in the SCC, the Procuring Entity shall grant theContractor possession of so much of the Site as may be required toenable it to proceed with the execution of the Works. If the Contractorsuffers delay or incurs cost from failure on the part of the ProcuringEntity to give possession in accordance with the terms of this clause,the Procuring Entity’s Representative shall give the Contractor aContract Time Extension and certify such sum as fair to cover the costincurred, which sum shall be paid by Procuring Entity.5.2. If possession of a portion is not given by the date stated in the SCCClause 5.1., the Procuring Entity will be deemed to have delayed thestart of the relevant activities. The resulting adjustments in contacttime to address such delay shall be in accordance with GCC Clause 47.5.3. The Contractor shall bear all costs and charges for special or temporaryright-of-way required by it in connection with access to the Site. TheContractor shall also provide at his own cost any additional facilitiesoutside the Site required by it for purposes of the Works.5.4. The Contractor shall allow the Procuring Entity’s Representative andany person authorized by the Procuring Entity’s Representative access46Clark Development CorporationSection IV General Conditions of ContractProposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)
to the Site and to any place where work in connection with thisContract is being carried out or is intended to be carried out.6. The Contractor’s Obligations6.1. The Contractor shall carry out the Works properly and in accordancewith this Contract. The Contractor shall provide all supervision, labor,Materials, Plant and Contractor's Equipment, which may be required.All Materials and Plant on Site shall be deemed to be the property ofthe Procuring Entity.6.2. The Contractor shall commence execution of the Works on the StartDate and shall carry out the Works in accordance with the Program ofWork submitted by the Contractor, as updated with the approval of theProcuring Entity’s Representative, and complete them by the IntendedCompletion Date.6.3. The Contractor shall be responsible for the safety of all activities on theSite.6.4. The Contractor shall carry out all instructions of the Procuring Entity’sRepresentative that comply with the applicable laws where the Site islocated.6.5. The Contractor shall employ the key personnel named in the Scheduleof Key Personnel, as referred to in the SCC, to carry out thesupervision of the Works. The Procuring Entity will approve anyproposed replacement of key personnel only if their relevantqualifications and abilities are equal to or better than those of thepersonnel listed in the Schedule.6.6. If the Procuring Entity’s Representative asks the Contractor to removea member of the Contractor’s staff or work force, for justifiable cause,the Contractor shall ensure that the person leaves the Site within seven(7) days and has no further connection with the Work in this Contract.6.7. During Contract implementation, the Contractor and his subcontractorsshall abide at all times by all labor laws, including child labor relatedenactments, and other relevant rules.6.8. The Contractor shall submit to the Procuring Entity for consent thename and particulars of the person authorized to receive instructionson behalf of the Contractor.6.9. The Contractor shall cooperate and share the Site with othercontractors, public authorities, utilities, and the Procuring Entitybetween the dates given in the schedule of other contractors47Clark Development CorporationSection IV General Conditions of ContractProposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)
- Page 1 and 2: Clark Development CorporationClark
- Page 3 and 4: Section I. Invitation to BidClark D
- Page 5 and 6: 5. A complete set of Bidding Docume
- Page 7 and 8: Section II. Instructions to Bidders
- Page 9: A. General1. Scope of Bid1.1. The P
- Page 12 and 13: implementation of the project, if t
- Page 14 and 15: under ongoing contracts, including
- Page 16 and 17: 6.8. Bidders should note that the P
- Page 18 and 19: Philippines, in which case the Engl
- Page 20 and 21: (i.2)a surety bond accompanied by a
- Page 22 and 23: 15. Bid Prices15.1. The contract sh
- Page 24 and 25: draft/guarantee, or irrevocable let
- Page 26 and 27: 19.3. The Bidder shall prepare an o
- Page 28 and 29: administrative, civil, and criminal
- Page 30 and 31: 27. Detailed Evaluation and Compari
- Page 32 and 33: Calculated Bid to make a similar de
- Page 34 and 35: (a)Submission of the following docu
- Page 36 and 37: 33. Notice to Proceed33.1. Within t
- Page 38 and 39: Bid Data SheetITBClause1.1. The PRO
- Page 40 and 41: 14.2. No further instructions.15.4.
- Page 42 and 43: Section IV. General Conditions ofCo
- Page 44 and 45: 27.RIGHT TO VARY...................
- Page 46 and 47: 1.13. The Defects Liability Period
- Page 50 and 51: particularly when they shall requir
- Page 52 and 53: Procuring Entity shall rescind this
- Page 54 and 55: and/or intended purpose of the same
- Page 56 and 57: 15.2. The Contractor shall provide
- Page 58 and 59: 16.5. All materials on the Site, Pl
- Page 60 and 61: 18.5. When persons from either part
- Page 62 and 63: (i) Employment of competent technic
- Page 64 and 65: decision was wrongly taken, the dec
- Page 66 and 67: 27. Right to Vary27.1. The Procurin
- Page 68 and 69: 32. Management Conferences32.1. Eit
- Page 70 and 71: 38. Uncorrected Defects38.1. The Pr
- Page 72 and 73: (c)Include the valuations of approv
- Page 74 and 75: (a)(b)(c)(d)(e)If the Procuring Ent
- Page 76 and 77: unless there are justifiable reason
- Page 78 and 79: consideration and the validity of t
- Page 80 and 81: GCC ClauseSpecial Conditions of Con
- Page 82 and 83: Section VI. Technical Specification
- Page 84 and 85: Item 800 (b) Cleaning and Scrubbing
- Page 86 and 87: in the approved Plan shall undertak
- Page 88 and 89: The concrete materials shall be pro
- Page 90 and 91: The quantity of metal structures to
- Page 92 and 93: Valves for water supply system shal
- Page 94 and 95: High Pressure Plastic Laminate comp
- Page 96 and 97: ALUMINUM GLASS WINDOWS (Supply and
to the Site and to any place where work in connection with thisContract is being carried out or is intended to be carried out.6. The Contractor’s Obligations6.1. The Contractor shall carry out the Works properly and in accordancewith this Contract. The Contractor shall provide all supervision, labor,Materials, Plant and Contractor's Equipment, which may be required.All Materials and Plant on Site shall be deemed to be the property <strong>of</strong>the Procuring Entity.6.2. The Contractor shall commence execution <strong>of</strong> the Works on the StartDate and shall carry out the Works in accordance with the Program <strong>of</strong>Work submitted by the Contractor, as updated with the approval <strong>of</strong> theProcuring Entity’s Representative, and complete them by the IntendedCompletion Date.6.3. The Contractor shall be responsible for the safety <strong>of</strong> all activities on theSite.6.4. The Contractor shall carry out all instructions <strong>of</strong> the Procuring Entity’sRepresentative that comply with the applicable laws where the Site islocated.6.5. The Contractor shall employ the key personnel named in the Schedule<strong>of</strong> Key Personnel, as referred to in the SCC, to carry out thesupervision <strong>of</strong> the Works. The Procuring Entity will approve anyproposed replacement <strong>of</strong> key personnel only if their relevantqualifications and abilities are equal to or better than those <strong>of</strong> thepersonnel listed in the Schedule.6.6. If the Procuring Entity’s Representative asks the Contractor to removea member <strong>of</strong> the Contractor’s staff or work force, for justifiable cause,the Contractor shall ensure that the person leaves the Site within seven(7) days and has no further connection with the Work in this Contract.6.7. During Contract implementation, the Contractor and his subcontractorsshall abide at all times by all labor laws, including child labor relatedenactments, and other relevant rules.6.8. The Contractor shall submit to the Procuring Entity for consent thename and particulars <strong>of</strong> the person authorized to receive instructionson behalf <strong>of</strong> the Contractor.6.9. The Contractor shall cooperate and share the Site with othercontractors, public authorities, utilities, and the Procuring Entitybetween the dates given in the schedule <strong>of</strong> other contractors47<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> Contract<strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)