10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.13. The Defects Liability Period is the one year period between projectcompletion and final acceptance within which the Contractor assumesthe responsibility to undertake the repair <strong>of</strong> any damage to the Worksat his own expense.1.14. Drawings are graphical presentations <strong>of</strong> the Works. They include allsupplementary details, shop drawings, calculations, and otherinformation provided or approved for the execution <strong>of</strong> this Contract.1.15. Equipment refers to all facilities, supplies, appliances, materials orthings required for the execution and completion <strong>of</strong> the Work providedby the Contractor and which shall not form or are not intended to formpart <strong>of</strong> the Permanent Works.1.16. The Intended Completion Date refers to the date specified in theSCC when the Contractor is expected to have completed the Works.The Intended Completion Date may be revised only by the ProcuringEntity’s Representative by issuing an extension <strong>of</strong> time or anacceleration order.1.17. Materials are all supplies, including consumables, used by theContractor for incorporation in the Works.1.18. The Notice to Proceed is a written notice issued by the ProcuringEntity or the Procuring Entity’s Representative to the Contractorrequiring the latter to begin the commencement <strong>of</strong> the work not laterthan a specified or determinable date.1.19. Permanent Works all permanent structures and all other projectfeatures and facilities required to be constructed and completed inaccordance with this Contract which shall be delivered to the ProcuringEntity and which shall remain at the Site after the removal <strong>of</strong> allTemporary Works.1.20. Plant refers to the machinery, apparatus, and the like intended t<strong>of</strong>orm an integral part <strong>of</strong> the Permanent Works.1.21. The Procuring Entity is the party who employs the Contractor tocarry out the Works stated in the SCC.1.22. The Procuring Entity’s Representative refers to the Head <strong>of</strong> theProcuring Entity or his duly authorized representative, identified in theSCC, who shall be responsible for supervising the execution <strong>of</strong> theWorks and administering this Contract.1.23. The Site is the place provided by the Procuring Entity where the Worksshall be executed and any other place or places which may be44<strong>Clark</strong> Development CorporationSection IV General Conditions <strong>of</strong> Contract<strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!