10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Calculated Bid to make a similar determination <strong>of</strong> that Bidder’scapabilities to perform satisfactorily. If the second Bidder, however,fails the post qualification, the procedure for post qualification shall berepeated for the Bidder with the next Lowest Calculated Bid, and so onuntil the Lowest Calculated and Responsive Bid is determined forcontract award.28.6. Within a period not exceeding seven (7) calendar days from the date <strong>of</strong>receipt <strong>of</strong> the recommendation <strong>of</strong> the BAC, the Head <strong>of</strong> the ProcuringEntity shall approve or disapprove the said recommendation. In thecase <strong>of</strong> government owned and government-owned and/or -controlledcorporations (GOCCs) and government financial institutions (GFIs), theperiod provided herein shall be fifteen (15) calendar days.29. Reservation Clause29.1. Notwithstanding the eligibility or post-qualification <strong>of</strong> a bidder, theProcuring Entity concerned reserves the right to review itsqualifications at any stage <strong>of</strong> the procurement process if it hasreasonable grounds to believe that a misrepresentation has been madeby the said bidder, or that there has been a change in the Bidder’scapability to undertake the project from the time it submitted itseligibility requirements. Should such review uncover anymisrepresentation made in the eligibility and bidding requirements,statements or documents, or any changes in the situation <strong>of</strong> the Bidderwhich will affect its capability to undertake the project so that it failsthe preset eligibility or bid evaluation criteria, the Procuring Entity shallconsider the said Bidder as ineligible and shall disqualify it fromsubmitting a bid or from obtaining an award or contract.29.2. Based on the following grounds, the Procuring Entity reserves the rightto reject any and all Bids, declare a Failure <strong>of</strong> Bidding at any time priorto the contract award, or not to award the contract, without therebyincurring any liability, and make no assurance that a contract shall beentered into as a result <strong>of</strong> the bidding:(a)(b)If there is prima facie evidence <strong>of</strong> collusion between appropriatepublic <strong>of</strong>ficers or employees <strong>of</strong> the Procuring Entity, or betweenthe BAC and any <strong>of</strong> the bidders, or if the collusion is between oramong the bidders themselves, or between a bidder and a thirdparty, including any act which restricts, suppresses or nullifies ortends to restrict, suppress or nullify competition;If the Procuring Entity’s BAC is found to have failed in followingthe prescribed bidding procedures; or30<strong>Clark</strong> Development CorporationSection II Instructions to Bidders<strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!