- Page 1: Clark Development CorporationClark
- Page 5 and 6: 5. A complete set of Bidding Docume
- Page 7 and 8: Section II. Instructions to Bidders
- Page 9: A. General1. Scope of Bid1.1. The P
- Page 12 and 13: implementation of the project, if t
- Page 14 and 15: under ongoing contracts, including
- Page 16 and 17: 6.8. Bidders should note that the P
- Page 18 and 19: Philippines, in which case the Engl
- Page 20 and 21: (i.2)a surety bond accompanied by a
- Page 22 and 23: 15. Bid Prices15.1. The contract sh
- Page 24 and 25: draft/guarantee, or irrevocable let
- Page 26 and 27: 19.3. The Bidder shall prepare an o
- Page 28 and 29: administrative, civil, and criminal
- Page 30 and 31: 27. Detailed Evaluation and Compari
- Page 32 and 33: Calculated Bid to make a similar de
- Page 34 and 35: (a)Submission of the following docu
- Page 36 and 37: 33. Notice to Proceed33.1. Within t
- Page 38 and 39: Bid Data SheetITBClause1.1. The PRO
- Page 40 and 41: 14.2. No further instructions.15.4.
- Page 42 and 43: Section IV. General Conditions ofCo
- Page 44 and 45: 27.RIGHT TO VARY...................
- Page 46 and 47: 1.13. The Defects Liability Period
- Page 48 and 49: 2.2. If sectional completion is spe
- Page 50 and 51: particularly when they shall requir
- Page 52 and 53:
Procuring Entity shall rescind this
- Page 54 and 55:
and/or intended purpose of the same
- Page 56 and 57:
15.2. The Contractor shall provide
- Page 58 and 59:
16.5. All materials on the Site, Pl
- Page 60 and 61:
18.5. When persons from either part
- Page 62 and 63:
(i) Employment of competent technic
- Page 64 and 65:
decision was wrongly taken, the dec
- Page 66 and 67:
27. Right to Vary27.1. The Procurin
- Page 68 and 69:
32. Management Conferences32.1. Eit
- Page 70 and 71:
38. Uncorrected Defects38.1. The Pr
- Page 72 and 73:
(c)Include the valuations of approv
- Page 74 and 75:
(a)(b)(c)(d)(e)If the Procuring Ent
- Page 76 and 77:
unless there are justifiable reason
- Page 78 and 79:
consideration and the validity of t
- Page 80 and 81:
GCC ClauseSpecial Conditions of Con
- Page 82 and 83:
Section VI. Technical Specification
- Page 84 and 85:
Item 800 (b) Cleaning and Scrubbing
- Page 86 and 87:
in the approved Plan shall undertak
- Page 88 and 89:
The concrete materials shall be pro
- Page 90 and 91:
The quantity of metal structures to
- Page 92 and 93:
Valves for water supply system shal
- Page 94 and 95:
High Pressure Plastic Laminate comp
- Page 96 and 97:
ALUMINUM GLASS WINDOWS (Supply and
- Page 98 and 99:
Doors shall be operated and with pr
- Page 100 and 101:
Mortar mixture shall be freshly pre
- Page 102 and 103:
portion(s) shall not start until cl
- Page 104 and 105:
All panel board and metallic boxes
- Page 106 and 107:
Panel boards shall conform to the s
- Page 108 and 109:
Section VII. DrawingsSee attached10
- Page 110 and 111:
Section VIII. Bill of Quantities108
- Page 112 and 113:
Bid FormDate: ___________________IA
- Page 114 and 115:
Form of Contract AgreementTHIS Cont
- Page 116 and 117:
A C K N O W L E D G E M E N TREPUBL
- Page 118 and 119:
6. [Name of Bidder] is authorizing
- Page 120 and 121:
Any one of the Following:o Computat
- Page 122 and 123:
Sample Forms of Eligibility, Techni
- Page 124 and 125:
Standard Form Number: SF-INFR-16Sta
- Page 126 and 127:
Standard Form Number: SF-INFR-20Rev
- Page 128 and 129:
we undertake to pay to the Entity u
- Page 130 and 131:
2) if the Principal does not accept
- Page 132 and 133:
Standard Form Number: SF-INFR-45Rev
- Page 134 and 135:
Standard Form Number: SF-INFR-46Rev
- Page 136 and 137:
Standard Form Number: SF-INFR-47Rev
- Page 138 and 139:
Standard Form Number: SF-INFR-48Qua
- Page 140 and 141:
DAYWORK SCHEDULEPROJECT : Proposed