draft/guarantee, or irrevocable letter of credit from other banks certifiedby the BSP as authorized to issue such financial statement.18.2. The bid security should be valid for the period specified in the BDS.Any bid not accompanied by an acceptable bid security shall berejected by the Procuring Entity as non-responsive.18.3. No bid securities shall be returned to bidders after the opening of bidsand before contract signing, except to those that failed or declared aspost-disqualified, upon submission of a written waiver of their right tofile a motion for reconsideration and/or protest. Without prejudice onits forfeiture, Bid Securities shall be returned only after the bidder withthe Lowest Calculated Responsive Bid has signed the contract andfurnished the Performance Security, but in no case later than theexpiration of the Bid Security validity period indicated in ITB Clause18.2.18.4. Upon signing and execution of the contract, pursuant to ITB Clause31, and the posting of the performance security, pursuant to ITBClause 32, the successful Bidder’s Bid security will be discharged, butin no case later than the Bid security validity period as indicated in ITBClause 18.2.18.5. The bid security may be forfeited:(a)if a Bidder:(i)(ii)(iii)(iv)(v)(vi)withdraws its Bid during the period of Bid validityspecified in ITB Clause 17;does not accept the correction of errors pursuant to ITBClause 27.3 (b);fails to submit the requirements within the prescribedperiod, or a finding against their veracity, as stated inITB Clause 28.2.;submission of eligibility requirements containing falseinformation or falsified documents;submission of bids that contain false information orfalsified documents, or the concealment of suchinformation in the bids in order to influence the outcomeof eligibility screening or any other stage of the publicbidding;allowing the use of one’s name, or using the name ofanother for purposes of public bidding;22Clark Development CorporationSection II Instructions to BiddersProposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)
(vii)(viii)(ix)(x)(xi)(xii)withdrawal of a bid, or refusal to accept an award, orenter into contract with the Government withoutjustifiable cause, after the Bidder had been adjudged ashaving submitted the Lowest Calculated and ResponsiveBid;refusal or failure to post the required performancesecurity within the prescribed time;refusal to clarify or validate in writing its bid during postqualificationwithin a period of seven (7) calendar daysfrom receipt of the request for clarification;any documented attempt by a bidder to unduly influencethe outcome of the bidding in his favor;failure of the potential joint venture partners to enter intothe joint venture after the bid is declared successful; orall other acts that tend to defeat the purpose of thecompetitive bidding, such as habitually withdrawing frombidding, submitting late Bids or patently insufficient bid,for at least three (3) times within a year, except for validreasons.(b)if the successful Bidder:(i)(ii)fails to sign the contract in accordance with ITB Clause31;fails to furnish performance security in accordance withITB Clause 32.19. Format and Signing of Bids19.1. Bidders shall submit their bids through their duly authorizedrepresentative using the appropriate forms provided in Section IXBidding Forms on or before the deadline specified in the ITB Clauses21 in two (2) separate sealed bid envelopes, and which shall besubmitted simultaneously. The first shall contain the technicalcomponent of the bid, including the eligibility requirements under ITBClause 12.1, and the second shall contain the financial component ofthe bid.19.2. Forms as mentioned in ITB Clause 19.1 must be completed withoutany alterations to their format, and no substitute form shall beaccepted. All blank spaces shall be filled in with the informationrequested.23Clark Development CorporationSection II Instructions to BiddersProposed Renovation of Former Jacinto Building(Motorpool, Records, Warehouses and Maintenance Area)
- Page 1 and 2: Clark Development CorporationClark
- Page 3 and 4: Section I. Invitation to BidClark D
- Page 5 and 6: 5. A complete set of Bidding Docume
- Page 7 and 8: Section II. Instructions to Bidders
- Page 9: A. General1. Scope of Bid1.1. The P
- Page 12 and 13: implementation of the project, if t
- Page 14 and 15: under ongoing contracts, including
- Page 16 and 17: 6.8. Bidders should note that the P
- Page 18 and 19: Philippines, in which case the Engl
- Page 20 and 21: (i.2)a surety bond accompanied by a
- Page 22 and 23: 15. Bid Prices15.1. The contract sh
- Page 26 and 27: 19.3. The Bidder shall prepare an o
- Page 28 and 29: administrative, civil, and criminal
- Page 30 and 31: 27. Detailed Evaluation and Compari
- Page 32 and 33: Calculated Bid to make a similar de
- Page 34 and 35: (a)Submission of the following docu
- Page 36 and 37: 33. Notice to Proceed33.1. Within t
- Page 38 and 39: Bid Data SheetITBClause1.1. The PRO
- Page 40 and 41: 14.2. No further instructions.15.4.
- Page 42 and 43: Section IV. General Conditions ofCo
- Page 44 and 45: 27.RIGHT TO VARY...................
- Page 46 and 47: 1.13. The Defects Liability Period
- Page 48 and 49: 2.2. If sectional completion is spe
- Page 50 and 51: particularly when they shall requir
- Page 52 and 53: Procuring Entity shall rescind this
- Page 54 and 55: and/or intended purpose of the same
- Page 56 and 57: 15.2. The Contractor shall provide
- Page 58 and 59: 16.5. All materials on the Site, Pl
- Page 60 and 61: 18.5. When persons from either part
- Page 62 and 63: (i) Employment of competent technic
- Page 64 and 65: decision was wrongly taken, the dec
- Page 66 and 67: 27. Right to Vary27.1. The Procurin
- Page 68 and 69: 32. Management Conferences32.1. Eit
- Page 70 and 71: 38. Uncorrected Defects38.1. The Pr
- Page 72 and 73: (c)Include the valuations of approv
(vii)(viii)(ix)(x)(xi)(xii)withdrawal <strong>of</strong> a bid, or refusal to accept an award, orenter into contract with the Government withoutjustifiable cause, after the Bidder had been adjudged ashaving submitted the Lowest Calculated and ResponsiveBid;refusal or failure to post the required performancesecurity within the prescribed time;refusal to clarify or validate in writing its bid during postqualificationwithin a period <strong>of</strong> seven (7) calendar daysfrom receipt <strong>of</strong> the request for clarification;any documented attempt by a bidder to unduly influencethe outcome <strong>of</strong> the bidding in his favor;failure <strong>of</strong> the potential joint venture partners to enter intothe joint venture after the bid is declared successful; orall other acts that tend to defeat the purpose <strong>of</strong> thecompetitive bidding, such as habitually withdrawing frombidding, submitting late Bids or patently insufficient bid,for at least three (3) times within a year, except for validreasons.(b)if the successful Bidder:(i)(ii)fails to sign the contract in accordance with ITB Clause31;fails to furnish performance security in accordance withITB Clause 32.19. Format and Signing <strong>of</strong> Bids19.1. Bidders shall submit their bids through their duly authorizedrepresentative using the appropriate forms provided in Section IXBidding Forms on or before the deadline specified in the ITB Clauses21 in two (2) separate sealed bid envelopes, and which shall besubmitted simultaneously. The first shall contain the technicalcomponent <strong>of</strong> the bid, including the eligibility requirements under ITBClause 12.1, and the second shall contain the financial component <strong>of</strong>the bid.19.2. Forms as mentioned in ITB Clause 19.1 must be completed withoutany alterations to their format, and no substitute form shall beaccepted. All blank spaces shall be filled in with the informationrequested.23<strong>Clark</strong> Development CorporationSection II Instructions to Bidders<strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)