10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10. Experience:This should cover the past ten (10) years <strong>of</strong> experience. (Attached as many pagesas necessary to show involvement <strong>of</strong> personnel in projects using the format below).1. Name : ____________________________________________2. Name and Address <strong>of</strong> Owner :_____________________________________3. Name and Address <strong>of</strong> theOwner’s Engineer: ____________________________________________(Consultant)4. Indicate the Features <strong>of</strong> Project(particulars <strong>of</strong> the project components and any other particular interest connectedwith the project):___________________________________________5. Contract Amount Expressed inPhilippine Currency : ____________________________________________6. Position : ____________________________________________7. Structures for which the employeewas responsible : ____________________________________________8. Assignment Period : from _______ (months) _______ (years): to _______ (months) _______ (years)___________________________Name and Signature <strong>of</strong> EmployeeIt is hereby certified that the above personnel can be assigned to this project, if thecontract is awarded to our company.___________________________________(Place and Date)____________________________________(The Authorized Representative)192

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!