Proposed Renovation of Former Jacinto Building - Clark Freeport Zone
Proposed Renovation of Former Jacinto Building - Clark Freeport Zone Proposed Renovation of Former Jacinto Building - Clark Freeport Zone
Standard Form Number: SF-INFR-47Revised on: August 11, 2004KEY PERSONNEL(FORMAT OF BIO-DATA)Give the detailed information of the following personnel who are scheduled to beassigned as full-time field staff for the project. Fill up a form for each person.- Authorized Managing Officer / Representative- Sustained Technical Employee1. Name : ____________________________________________2. Date of Birth: ____________________________________________3. Nationality: ____________________________________________4. Education and Degrees: ____________________________________________5. Specialty : ____________________________________________6. Registration : ____________________________________________7. Length of Service with the Firm :_____Year from____(months) _____ (year)To ____ (months) _____ (year)8. Years of Experience: ____________________________________________9. If Item 7 is less than ten (10) years, give name and length of service with previousemployers for a ten (10)-year period (attached additional sheet/s), if necessary:Name and Address of EmployerLength of Service________________________________________________________________________________ year(s) from _______ to ___________ year(s) from _______ to ___________ year(s) from _______ to ______191
10. Experience:This should cover the past ten (10) years of experience. (Attached as many pagesas necessary to show involvement of personnel in projects using the format below).1. Name : ____________________________________________2. Name and Address of Owner :_____________________________________3. Name and Address of theOwner’s Engineer: ____________________________________________(Consultant)4. Indicate the Features of Project(particulars of the project components and any other particular interest connectedwith the project):___________________________________________5. Contract Amount Expressed inPhilippine Currency : ____________________________________________6. Position : ____________________________________________7. Structures for which the employeewas responsible : ____________________________________________8. Assignment Period : from _______ (months) _______ (years): to _______ (months) _______ (years)___________________________Name and Signature of EmployeeIt is hereby certified that the above personnel can be assigned to this project, if thecontract is awarded to our company.___________________________________(Place and Date)____________________________________(The Authorized Representative)192
- Page 86 and 87: in the approved Plan shall undertak
- Page 88 and 89: The concrete materials shall be pro
- Page 90 and 91: The quantity of metal structures to
- Page 92 and 93: Valves for water supply system shal
- Page 94 and 95: High Pressure Plastic Laminate comp
- Page 96 and 97: ALUMINUM GLASS WINDOWS (Supply and
- Page 98 and 99: Doors shall be operated and with pr
- Page 100 and 101: Mortar mixture shall be freshly pre
- Page 102 and 103: portion(s) shall not start until cl
- Page 104 and 105: All panel board and metallic boxes
- Page 106 and 107: Panel boards shall conform to the s
- Page 108 and 109: Section VII. DrawingsSee attached10
- Page 110 and 111: Section VIII. Bill of Quantities108
- Page 112 and 113: Bid FormDate: ___________________IA
- Page 114 and 115: Form of Contract AgreementTHIS Cont
- Page 116 and 117: A C K N O W L E D G E M E N TREPUBL
- Page 118 and 119: 6. [Name of Bidder] is authorizing
- Page 120 and 121: Any one of the Following:o Computat
- Page 122 and 123: Sample Forms of Eligibility, Techni
- Page 124 and 125: Standard Form Number: SF-INFR-16Sta
- Page 126 and 127: Standard Form Number: SF-INFR-20Rev
- Page 128 and 129: we undertake to pay to the Entity u
- Page 130 and 131: 2) if the Principal does not accept
- Page 132 and 133: Standard Form Number: SF-INFR-45Rev
- Page 134 and 135: Standard Form Number: SF-INFR-46Rev
- Page 138 and 139: Standard Form Number: SF-INFR-48Qua
- Page 140 and 141: DAYWORK SCHEDULEPROJECT : Proposed
Standard Form Number: SF-INFR-47Revised on: August 11, 2004KEY PERSONNEL(FORMAT OF BIO-DATA)Give the detailed information <strong>of</strong> the following personnel who are scheduled to beassigned as full-time field staff for the project. Fill up a form for each person.- Authorized Managing Officer / Representative- Sustained Technical Employee1. Name : ____________________________________________2. Date <strong>of</strong> Birth: ____________________________________________3. Nationality: ____________________________________________4. Education and Degrees: ____________________________________________5. Specialty : ____________________________________________6. Registration : ____________________________________________7. Length <strong>of</strong> Service with the Firm :_____Year from____(months) _____ (year)To ____ (months) _____ (year)8. Years <strong>of</strong> Experience: ____________________________________________9. If Item 7 is less than ten (10) years, give name and length <strong>of</strong> service with previousemployers for a ten (10)-year period (attached additional sheet/s), if necessary:Name and Address <strong>of</strong> EmployerLength <strong>of</strong> Service________________________________________________________________________________ year(s) from _______ to ___________ year(s) from _______ to ___________ year(s) from _______ to ______191