Standard Form Number: SF-INFR-16Statement of all Government & Private Contracts completed which aresimilar in natureBusiness Name: ___________________________________________________Business Address: ___________________________________________________Name of Contract a. Owner’s Nameb. Addressc. Telephone Nos.Nature of WorkBidder’s RoleDescription %a. Amount atAwardb. Amount atCompletionc. Durationa. Date Awardedb. Contract Effectivityc. Date CompletedGovernmentPrivateNote: This statement shall be supported with the following:1 Contractor’s Performance Evaluation System rating sheets and/or2 Certificates of Completion3 Certificate of Acceptance by the OwnerSubmitted byDesignationDate: ___________________________________________________(Printed Name & Signature): ___________________________________________________: ___________________________________________________179
Standard Form Number: SF-INFR-19Revised on: July 29, 2004FINANCIAL DOCUMENTS FOR ELIGIBILITY CHECKA. Summary of the Applicant Firm’s/Contractor’s assets and liabilities on the basis of the attached income tax returnand audited financial statement, stamped “RECEIVED” by the Bureau of Internal Revenue or BIR authorizedcollecting agent, for the immediately preceding year and a certified copy of Schedule of Fixed Assets particularlythe list of construction equipment.1. Total Assets2. Current Assets3. Total Liabilities4. Current Liabilities5. Total Net Worth (1-3)6. Current Net Worth or Net Working Capital(2-4)Year 2010B. The Net Financial Contracting Capacity (NFCC) based on the above data is computed as follows:NFCC = K (current asset – current liabilities) minus value of all outstanding works under ongoing contractsincluding awarded contracts yet to be startedNFCC = P _______________________________________K = 10 for a contract duration of one year or less, 15 for more than one year up to two years and 20 for morethan two years or a Commitment from a licensed bank to extend to it a credit line if awarded the contract or acash deposit certificate in the amount of at least 10% of the proposed project to bid.Name of Bank: ________________________________ Amount: ___________________Herewith attached are certified true copies of the income tax return and audited financial statement: stamped“RECEIVED” by the BIR or BIR authorized collecting agent for the immediately preceding year and the cash depositcertificate or certificate of commitment from a licensed bank to extend a credit line.Submitted by:__________________________________Name of Firm / Contractor_________________________________________Signature of Authorized RepresentativeDate : _____________________________NOTE:1. If Partnership or Joint Venture, each Partner or Member Firm of Joint Venture shall submit the aboverequirements.180
- Page 74 and 75: (a)(b)(c)(d)(e)If the Procuring Ent
- Page 76 and 77: unless there are justifiable reason
- Page 78 and 79: consideration and the validity of t
- Page 80 and 81: GCC ClauseSpecial Conditions of Con
- Page 82 and 83: Section VI. Technical Specification
- Page 84 and 85: Item 800 (b) Cleaning and Scrubbing
- Page 86 and 87: in the approved Plan shall undertak
- Page 88 and 89: The concrete materials shall be pro
- Page 90 and 91: The quantity of metal structures to
- Page 92 and 93: Valves for water supply system shal
- Page 94 and 95: High Pressure Plastic Laminate comp
- Page 96 and 97: ALUMINUM GLASS WINDOWS (Supply and
- Page 98 and 99: Doors shall be operated and with pr
- Page 100 and 101: Mortar mixture shall be freshly pre
- Page 102 and 103: portion(s) shall not start until cl
- Page 104 and 105: All panel board and metallic boxes
- Page 106 and 107: Panel boards shall conform to the s
- Page 108 and 109: Section VII. DrawingsSee attached10
- Page 110 and 111: Section VIII. Bill of Quantities108
- Page 112 and 113: Bid FormDate: ___________________IA
- Page 114 and 115: Form of Contract AgreementTHIS Cont
- Page 116 and 117: A C K N O W L E D G E M E N TREPUBL
- Page 118 and 119: 6. [Name of Bidder] is authorizing
- Page 120 and 121: Any one of the Following:o Computat
- Page 122 and 123: Sample Forms of Eligibility, Techni
- Page 126 and 127: Standard Form Number: SF-INFR-20Rev
- Page 128 and 129: we undertake to pay to the Entity u
- Page 130 and 131: 2) if the Principal does not accept
- Page 132 and 133: Standard Form Number: SF-INFR-45Rev
- Page 134 and 135: Standard Form Number: SF-INFR-46Rev
- Page 136 and 137: Standard Form Number: SF-INFR-47Rev
- Page 138 and 139: Standard Form Number: SF-INFR-48Qua
- Page 140 and 141: DAYWORK SCHEDULEPROJECT : Proposed
Standard Form Number: SF-INFR-16Statement <strong>of</strong> all Government & Private Contracts completed which aresimilar in natureBusiness Name: ___________________________________________________Business Address: ___________________________________________________Name <strong>of</strong> Contract a. Owner’s Nameb. Addressc. Telephone Nos.Nature <strong>of</strong> WorkBidder’s RoleDescription %a. Amount atAwardb. Amount atCompletionc. Durationa. Date Awardedb. Contract Effectivityc. Date CompletedGovernmentPrivateNote: This statement shall be supported with the following:1 Contractor’s Performance Evaluation System rating sheets and/or2 Certificates <strong>of</strong> Completion3 Certificate <strong>of</strong> Acceptance by the OwnerSubmitted byDesignationDate: ___________________________________________________(Printed Name & Signature): ___________________________________________________: ___________________________________________________179