Clark Development CorporationClark
- Page 3 and 4:
Section I. Invitation to BidClark D
- Page 5 and 6:
5. A complete set of Bidding Docume
- Page 7 and 8:
Section II. Instructions to Bidders
- Page 9:
A. General1. Scope of Bid1.1. The P
- Page 12 and 13:
implementation of the project, if t
- Page 14 and 15:
under ongoing contracts, including
- Page 16 and 17:
6.8. Bidders should note that the P
- Page 18 and 19:
Philippines, in which case the Engl
- Page 20 and 21:
(i.2)a surety bond accompanied by a
- Page 22 and 23:
15. Bid Prices15.1. The contract sh
- Page 24 and 25:
draft/guarantee, or irrevocable let
- Page 26 and 27:
19.3. The Bidder shall prepare an o
- Page 28 and 29:
administrative, civil, and criminal
- Page 30 and 31:
27. Detailed Evaluation and Compari
- Page 32 and 33:
Calculated Bid to make a similar de
- Page 34 and 35:
(a)Submission of the following docu
- Page 36 and 37:
33. Notice to Proceed33.1. Within t
- Page 38 and 39:
Bid Data SheetITBClause1.1. The PRO
- Page 40 and 41:
14.2. No further instructions.15.4.
- Page 42 and 43:
Section IV. General Conditions ofCo
- Page 44 and 45:
27.RIGHT TO VARY...................
- Page 46 and 47:
1.13. The Defects Liability Period
- Page 48 and 49:
2.2. If sectional completion is spe
- Page 50 and 51:
particularly when they shall requir
- Page 52 and 53:
Procuring Entity shall rescind this
- Page 54 and 55:
and/or intended purpose of the same
- Page 56 and 57:
15.2. The Contractor shall provide
- Page 58 and 59: 16.5. All materials on the Site, Pl
- Page 60 and 61: 18.5. When persons from either part
- Page 62 and 63: (i) Employment of competent technic
- Page 64 and 65: decision was wrongly taken, the dec
- Page 66 and 67: 27. Right to Vary27.1. The Procurin
- Page 68 and 69: 32. Management Conferences32.1. Eit
- Page 70 and 71: 38. Uncorrected Defects38.1. The Pr
- Page 72 and 73: (c)Include the valuations of approv
- Page 74 and 75: (a)(b)(c)(d)(e)If the Procuring Ent
- Page 76 and 77: unless there are justifiable reason
- Page 78 and 79: consideration and the validity of t
- Page 80 and 81: GCC ClauseSpecial Conditions of Con
- Page 82 and 83: Section VI. Technical Specification
- Page 84 and 85: Item 800 (b) Cleaning and Scrubbing
- Page 86 and 87: in the approved Plan shall undertak
- Page 88 and 89: The concrete materials shall be pro
- Page 90 and 91: The quantity of metal structures to
- Page 92 and 93: Valves for water supply system shal
- Page 94 and 95: High Pressure Plastic Laminate comp
- Page 96 and 97: ALUMINUM GLASS WINDOWS (Supply and
- Page 98 and 99: Doors shall be operated and with pr
- Page 100 and 101: Mortar mixture shall be freshly pre
- Page 102 and 103: portion(s) shall not start until cl
- Page 104 and 105: All panel board and metallic boxes
- Page 106 and 107: Panel boards shall conform to the s
- Page 110 and 111: Section VIII. Bill of Quantities108
- Page 112 and 113: Bid FormDate: ___________________IA
- Page 114 and 115: Form of Contract AgreementTHIS Cont
- Page 116 and 117: A C K N O W L E D G E M E N TREPUBL
- Page 118 and 119: 6. [Name of Bidder] is authorizing
- Page 120 and 121: Any one of the Following:o Computat
- Page 122 and 123: Sample Forms of Eligibility, Techni
- Page 124 and 125: Standard Form Number: SF-INFR-16Sta
- Page 126 and 127: Standard Form Number: SF-INFR-20Rev
- Page 128 and 129: we undertake to pay to the Entity u
- Page 130 and 131: 2) if the Principal does not accept
- Page 132 and 133: Standard Form Number: SF-INFR-45Rev
- Page 134 and 135: Standard Form Number: SF-INFR-46Rev
- Page 136 and 137: Standard Form Number: SF-INFR-47Rev
- Page 138 and 139: Standard Form Number: SF-INFR-48Qua
- Page 140 and 141: DAYWORK SCHEDULEPROJECT : Proposed