10.07.2015 Views

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

Proposed Renovation of Former Jacinto Building - Clark Freeport Zone

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

portion(s) shall not start until clearance to proceed is ordered by theEngineere. Hardware, lighting fixture and other similar items shall be removed orprotected and re-installed after completion <strong>of</strong> the work.The areas <strong>of</strong> concrete and metal surfaces applied with paint and relatedcoating materials shall be measured in square meters while the varnishing <strong>of</strong>wooden doors and jambs shall be measured per set as desired and accepted tothe satisfaction <strong>of</strong> the Engineer.PART D – ELECTRICALGeneralAll works shall be done under the direct supervision <strong>of</strong> an Electrical Engineer andin strict accordance with these specifications and <strong>of</strong> the methods as prescribed bythe latest edition <strong>of</strong> the Philippine Electrical Code.All items not specifically mentioned in the specifications as noted on the drawingbut which are obviously necessary to make a complete working installation shall beincluded.CONDUITS, BOXES AND FITTINGSItems 1100 (1) to 1100 (19)DescriptionThis Item shall consist <strong>of</strong> the furnishing and installation <strong>of</strong> the complete conduitwork consisting <strong>of</strong> electrical conduits; conduit boxes such as junction boxes, pullboxes, utility boxes, octagonal and square boxes; conduit fittings such as couplings,locknuts and bushings and other electrical materials needed to complete theconduit roughing – in work <strong>of</strong> this project.Material RequirementsAll materials shall be brand new and shall be <strong>of</strong> the approved type meeting all therequirements <strong>of</strong> the Philippine Electrical Code and bearing the Philippine StandardAgency (PSA) mark.ConduitsConduit shall be standard rigid steel; zinc coated or galvanized, and shall beSchedule 40. Electrical metal conduit may be used if shown or specified on theapproved Plans. PVC conduit if required shall be Schedule 40. Enamel coated steelconduits and conduits with rough inner surfaces are not acceptable.100<strong>Clark</strong> Development Corporation <strong>Proposed</strong> <strong>Renovation</strong> <strong>of</strong> <strong>Former</strong> <strong>Jacinto</strong> <strong>Building</strong>(Motorpool, Records, Warehouses and Maintenance Area)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!