WVDP Phase 1 CSAPThis page intentionally left blank.Rev. 1 64
WVDP Phase 1 CSAP9.0 CIVIL SURVEYING AND COORDINATE CONTROLPhase 1 decommissioning data collection will require various levels of civil surveying support.This section identifies the various levels of civil surveying support that may be required as part ofPhase 1 activities. The information contained in this overview is based on USACE EM 1110-1-1005, Engineering and Design: Control and Topographic Surveying (USACE 2007), and onUSACE EM 1110-1-1003, NAVSTAR GPS Surveying (USACE 2003).9.1 Types of Civil SurveysThe general types of survey support potentially required by Phase 1 decommissioning activitiesgoing forward include the following:1. Reconnaissance Topographic Surveys. Reconnaissance surveys are site-mapping surveysintended to lay out general site features in support of general decision-making.Reconnaissance survey information can potentially be taken from existing aerial flyovers,hand-held differentially corrected global position system (GPS) surveys, or existingmaps. Relative feature coordinate accuracy is of importance; absolute feature coordinateaccuracy is of lesser importance. Reconnaissance surveys may be a precursor to moredetailed, accurate, and costly civil surveys. An example is a Light Detection and Ranging(LiDAR) data collection effort completed for the site in 2010.2. Detailed Topographic Surveys. Detailed surveys are the basis for detailed plans showingsite layout and facilities. Detailed topographic surveys can be completed by using a totalstation, GPS, laser scanning, plane table, and/or photogrammetric methods. In the contextof the WVDP premises, detailed surveys are also used to support environmental datacollection efforts. Detailed topographic surveys are for planning and data collectionsupport purposes and have accuracy standards that are specified suitable for the planningneeds requiring support. Accuracy standards can vary widely depending on data qualityneeds. For example, an accurate elevation measurement for a gamma reading of a soilsurface may not be necessary but, for a monitoring well, an accurate top-of-casingmeasurement is essential. A LiDAR topographic surface is available for the site based onLiDAR data collection completed in 2010.Rev. 1 65
- Page 30 and 31: WVDP Phase 1 CSAPTable 1: Phase 1 C
- Page 32 and 33: WVDP Phase 1 CSAPmethods, technolog
- Page 34 and 35: WVDP Phase 1 CSAPThis page intentio
- Page 36 and 37: WVDP Phase 1 CSAPinfrastructure inv
- Page 38 and 39: WVDP Phase 1 CSAPnone of the other
- Page 40 and 41: WVDP Phase 1 CSAPTable 2: ROI Sampl
- Page 42 and 43: WVDP Phase 1 CSAPFigure 4 Surface S
- Page 44 and 45: WVDP Phase 1 CSAPTable 3: Twelve Ra
- Page 46 and 47: WVDP Phase 1 CSAPCSAP data collecti
- Page 48 and 49: WVDP Phase 1 CSAP• In areas where
- Page 50 and 51: WVDP Phase 1 CSAPsample indicate co
- Page 52 and 53: WVDP Phase 1 CSAP• Buried infrast
- Page 54 and 55: WVDP Phase 1 CSAP• In all cases,
- Page 56 and 57: WVDP Phase 1 CSAPOne sample will be
- Page 58 and 59: WVDP Phase 1 CSAP• A minimum of f
- Page 60 and 61: WVDP Phase 1 CSAPThe number of core
- Page 62 and 63: WVDP Phase 1 CSAPFor field or on-si
- Page 64 and 65: WVDP Phase 1 CSAP• Samples will b
- Page 66 and 67: WVDP Phase 1 CSAPThe detection limi
- Page 68 and 69: WVDP Phase 1 CSAPcollected and subm
- Page 70 and 71: WVDP Phase 1 CSAPHowever, this is n
- Page 72 and 73: WVDP Phase 1 CSAPof 15 cm and analy
- Page 74 and 75: WVDP Phase 1 CSAPscans will be empl
- Page 76 and 77: WVDP Phase 1 CSAPThis page intentio
- Page 78 and 79: WVDP Phase 1 CSAPperformance for th
- Page 82 and 83: WVDP Phase 1 CSAP3. Utility Surveys
- Page 84 and 85: WVDP Phase 1 CSAPField notebooks wi
- Page 86 and 87: WVDP Phase 1 CSAP10.2 Groundwater S
- Page 88 and 89: WVDP Phase 1 CSAPphotographs are ta
- Page 90 and 91: WVDP Phase 1 CSAPthe course of fiel
- Page 92 and 93: WVDP Phase 1 CSAP10.6.2 Additional
- Page 94 and 95: WVDP Phase 1 CSAPplan will identify
- Page 96 and 97: WVDP Phase 1 CSAPFigure 7 WVDP Radi
- Page 98 and 99: Table 5: Estimated Scanning Minimum
- Page 100 and 101: WVDP Phase 1 CSAPpotentially exceed
- Page 102 and 103: WVDP Phase 1 CSAP• Each detector
- Page 104 and 105: WVDP Phase 1 CSAPThis page intentio
- Page 106 and 107: WVDP Phase 1 CSAP12.2 Standard Labo
- Page 108 and 109: WVDP Phase 1 CSAPThis page intentio
- Page 110 and 111: WVDP Phase 1 CSAPThis page intentio
- Page 112 and 113: WVDP Phase 1 CSAP• The data compl
- Page 114 and 115: WVDP Phase 1 CSAPThis page intentio
- Page 116 and 117: WVDP Phase 1 CSAPThis page intentio
- Page 118 and 119: WVDP Phase 1 CSAPVitrification Faci
- Page 120 and 121: WVDP Phase 1 CSAPA.4 Known and Susp
- Page 122 and 123: WVDP Phase 1 CSAPthe sanitary sewer
- Page 124 and 125: WVDP Phase 1 CSAPA.4.3.6Interceptor
- Page 126 and 127: WVDP Phase 1 CSAP1998, or 2008, and
- Page 128 and 129: WVDP Phase 1 CSAPcontaminated surfa
WVDP Phase 1 CSAPThis page intentionally left blank.Rev. 1 64