Conceptual Site Model - Argonne National Laboratory
Conceptual Site Model - Argonne National Laboratory Conceptual Site Model - Argonne National Laboratory
WVDP Phase 1 CSAPF.10 ReferencesDOE 2009. Phase I Decommissioning Plan for the West Valley Demonstration Project, Rev 2,prepared by Washington Safety Management Solutions, URS Washington Division,Science Applications International Corporation, prepared for DOE, December 2009.DOE 2010. Final Environmental Impact Statement for Decommissioning and/or Long-TermStewardship at the West Valley Demonstration Project and Western New York NuclearService Center, Vol 1, DOE/EIS-0226, January 2010.Rev. 1 F-22
WVDP Phase 1 CSAPTable F.1 Historical Data AnalysesNuclide# of SurfaceSoilLocations# ofSubsurfaceSoilLocations# of SedimentLocationsAm-241 0 3 0C-14 0 1 0Cm-243 0 1 0Cm-244 0 1 0Cs-137 9 6 3I-129 0 1 0Np-237 0 1 0Pu-238 0 3 0Pu-239 0 3 0Pu-240 0 3 0Pu-241 0 3 0Sr-90 9 6 3Tc-99 0 1 0U-232 0 1 0U-233 0 1 0U-234 0 1 0U-235 0 1 0U-238 0 1 0Rev. 1 F-23
- Page 298 and 299: WVDP Phase 1 CSAPis most likely ass
- Page 300 and 301: WVDP Phase 1 CSAPsample. If biased
- Page 302 and 303: WVDP Phase 1 CSAPsoils and a draina
- Page 304 and 305: WVDP Phase 1 CSAPE.9.6Buried Infras
- Page 306 and 307: WVDP Phase 1 CSAPE.9.9Decision-Maki
- Page 308 and 309: WVDP Phase 1 CSAPTable E.1 Historic
- Page 310 and 311: WVDP Phase 1 CSAPWMA 12Chemical Pro
- Page 312 and 313: WVDP Phase 1 CSAPFigure E.3 WMA 5 1
- Page 314 and 315: WVDP Phase 1 CSAPFigure E.5 WMA 5 1
- Page 316 and 317: WVDP Phase 1 CSAPFigure E.7 WMA 5 1
- Page 318 and 319: WVDP Phase 1 CSAPFigure E.9 WMA 5 2
- Page 320 and 321: WVDP Phase 1 CSAPFigure E.11 WMA 5
- Page 322 and 323: WVDP Phase 1 CSAPFigure E.13 Histor
- Page 324 and 325: WVDP Phase 1 CSAPFigure E.15 WMA 5
- Page 326 and 327: WVDP Phase 1 CSAPFigure E.17 WMA 5
- Page 328 and 329: WVDP Phase 1 CSAPNew Cooling Tower.
- Page 330 and 331: WVDP Phase 1 CSAPPlateau although t
- Page 332 and 333: WVDP Phase 1 CSAPF.4.2North Plateau
- Page 334 and 335: WVDP Phase 1 CSAPof the Process Bui
- Page 336 and 337: WVDP Phase 1 CSAPThe New Cooling To
- Page 338 and 339: WVDP Phase 1 CSAP• Verify Absence
- Page 340 and 341: WVDP Phase 1 CSAP• CG w Sampling.
- Page 342 and 343: WVDP Phase 1 CSAP• A minimum of t
- Page 344 and 345: WVDP Phase 1 CSAPand analyzed from
- Page 346 and 347: WVDP Phase 1 CSAPcontamination may
- Page 350 and 351: WVDP Phase 1 CSAPTable F.2 Sample N
- Page 352 and 353: WVDP Phase 1 CSAPFigure F.2 WMA 6 w
- Page 354 and 355: WVDP Phase 1 CSAPFigure F.4 WMA 6 A
- Page 356 and 357: WVDP Phase 1 CSAPFigure F.6 WMA 6 A
- Page 358 and 359: WVDP Phase 1 CSAPFigure F.8 WMA 6 A
- Page 360 and 361: WVDP Phase 1 CSAPFigure F.10 WMA 6
- Page 362 and 363: WVDP Phase 1 CSAPGP10208BH-19A137Cs
- Page 364 and 365: WVDP Phase 1 CSAPFigure F.14 WMA 6
- Page 366 and 367: WVDP Phase 1 CSAPFigure F.16 WMA 6
- Page 368 and 369: WVDP Phase 1 CSAPNFS Shallow Specia
- Page 370 and 371: WVDP Phase 1 CSAPLiquid that collec
- Page 372 and 373: WVDP Phase 1 CSAPeastern ends of th
- Page 374 and 375: WVDP Phase 1 CSAPG.4.3 Drainage Are
- Page 376 and 377: WVDP Phase 1 CSAPPhase 1 will not a
- Page 378 and 379: WVDP Phase 1 CSAPG.9.3 Surface Soil
- Page 380 and 381: WVDP Phase 1 CSAPoIf any 0-15 cm in
- Page 382 and 383: WVDP Phase 1 CSAP• Three location
- Page 384 and 385: WVDP Phase 1 CSAP• Backfill assoc
- Page 386 and 387: WVDP Phase 1 CSAPTable G.2 Sample N
- Page 388 and 389: WVDP Phase 1 CSAPFigure G.2 WMA 7 w
- Page 390 and 391: WVDP Phase 1 CSAPFigure G.4 Subsurf
- Page 392 and 393: WVDP Phase 1 CSAPFigure G.6 WMA 7 A
- Page 394 and 395: WVDP Phase 1 CSAPFigure G.8 WMA 7 A
- Page 396 and 397: WVDP Phase 1 CSAPFigure G.10 WMA 7
WVDP Phase 1 CSAPTable F.1 Historical Data AnalysesNuclide# of SurfaceSoilLocations# ofSubsurfaceSoilLocations# of SedimentLocationsAm-241 0 3 0C-14 0 1 0Cm-243 0 1 0Cm-244 0 1 0Cs-137 9 6 3I-129 0 1 0Np-237 0 1 0Pu-238 0 3 0Pu-239 0 3 0Pu-240 0 3 0Pu-241 0 3 0Sr-90 9 6 3Tc-99 0 1 0U-232 0 1 0U-233 0 1 0U-234 0 1 0U-235 0 1 0U-238 0 1 0Rev. 1 F-23