Conceptual Site Model - Argonne National Laboratory
Conceptual Site Model - Argonne National Laboratory Conceptual Site Model - Argonne National Laboratory
WVDP Phase 1 CSAPThis page intentionally left blank.Rev. 1 88
WVDP Phase 1 CSAP12.0 LABORATORY ANALYSESTwo levels of laboratory analyses are called for in this CSAP: rapid and standard.12.1 Rapid Laboratory AnalysesThe first level of laboratory analyses is for rapid-turnaround analyses of Cs-137 and Sr-90 for soils andgroundwater. “Rapid” is defined as results available within 48 hours of sample collection. Rapidturnaround is intended to support situations in which decisions are being made about whether to continuesampling to depth, to extend sampling laterally to bound contamination, or to continue excavation ofcontaminated soils. In these cases, subsequent field activities are contingent on sample results, and rapidavailability of those results is a requirement. “Rapid” turnaround will likely be accomplished bydeployment of on-site, dedicated analytical capabilities for Cs-137 and Sr-90, but may also beaccomplished through the use of expedited shipping and quick-turnaround analyses at an off-sitelaboratory.Although not expected, CSAP data collection activities may determine that other radionuclides are alsosignificant dose concerns and potentially significant decision-drivers for in-field decision-making. If thisoccurs, rapid-turnaround requirements may be expanded to include other radionuclides.The detection limit requirements for rapid-turnaround analyses of Cs-137 and Sr-90 are the same as thosefor standard off-site laboratory analyses. These detection limits may not be required for all samplesanalyzed on-site, but the on-site analytical capacity must exist for meeting these detection limits ifnecessary.The accuracy and precision of on-site methods will be determined and monitored through the use ofcertified standards.Other data quality parameters as described in Section 6.11 and Section 14.0 will also apply.Rev. 1 89
- Page 54 and 55: WVDP Phase 1 CSAP• In all cases,
- Page 56 and 57: WVDP Phase 1 CSAPOne sample will be
- Page 58 and 59: WVDP Phase 1 CSAP• A minimum of f
- Page 60 and 61: WVDP Phase 1 CSAPThe number of core
- Page 62 and 63: WVDP Phase 1 CSAPFor field or on-si
- Page 64 and 65: WVDP Phase 1 CSAP• Samples will b
- Page 66 and 67: WVDP Phase 1 CSAPThe detection limi
- Page 68 and 69: WVDP Phase 1 CSAPcollected and subm
- Page 70 and 71: WVDP Phase 1 CSAPHowever, this is n
- Page 72 and 73: WVDP Phase 1 CSAPof 15 cm and analy
- Page 74 and 75: WVDP Phase 1 CSAPscans will be empl
- Page 76 and 77: WVDP Phase 1 CSAPThis page intentio
- Page 78 and 79: WVDP Phase 1 CSAPperformance for th
- Page 80 and 81: WVDP Phase 1 CSAPThis page intentio
- Page 82 and 83: WVDP Phase 1 CSAP3. Utility Surveys
- Page 84 and 85: WVDP Phase 1 CSAPField notebooks wi
- Page 86 and 87: WVDP Phase 1 CSAP10.2 Groundwater S
- Page 88 and 89: WVDP Phase 1 CSAPphotographs are ta
- Page 90 and 91: WVDP Phase 1 CSAPthe course of fiel
- Page 92 and 93: WVDP Phase 1 CSAP10.6.2 Additional
- Page 94 and 95: WVDP Phase 1 CSAPplan will identify
- Page 96 and 97: WVDP Phase 1 CSAPFigure 7 WVDP Radi
- Page 98 and 99: Table 5: Estimated Scanning Minimum
- Page 100 and 101: WVDP Phase 1 CSAPpotentially exceed
- Page 102 and 103: WVDP Phase 1 CSAP• Each detector
- Page 106 and 107: WVDP Phase 1 CSAP12.2 Standard Labo
- Page 108 and 109: WVDP Phase 1 CSAPThis page intentio
- Page 110 and 111: WVDP Phase 1 CSAPThis page intentio
- Page 112 and 113: WVDP Phase 1 CSAP• The data compl
- Page 114 and 115: WVDP Phase 1 CSAPThis page intentio
- Page 116 and 117: WVDP Phase 1 CSAPThis page intentio
- Page 118 and 119: WVDP Phase 1 CSAPVitrification Faci
- Page 120 and 121: WVDP Phase 1 CSAPA.4 Known and Susp
- Page 122 and 123: WVDP Phase 1 CSAPthe sanitary sewer
- Page 124 and 125: WVDP Phase 1 CSAPA.4.3.6Interceptor
- Page 126 and 127: WVDP Phase 1 CSAP1998, or 2008, and
- Page 128 and 129: WVDP Phase 1 CSAPcontaminated surfa
- Page 130 and 131: WVDP Phase 1 CSAPdata collection is
- Page 132 and 133: WVDP Phase 1 CSAParranged on a tria
- Page 134 and 135: WVDP Phase 1 CSAP• Slurry Wall Fo
- Page 136 and 137: WVDP Phase 1 CSAP• If contaminati
- Page 138 and 139: WVDP Phase 1 CSAPappears to extend
- Page 140 and 141: WVDP Phase 1 CSAPTable A.2 Sample N
- Page 142 and 143: WVDP Phase 1 CSAPFigure A.2 WMA 1 w
- Page 144 and 145: WVDP Phase 1 CSAPFigure A.4 North P
- Page 146 and 147: WVDP Phase 1 CSAPFigure A.6 WMA 1 A
- Page 148 and 149: WVDP Phase 1 CSAPFigure A.8 WMA 1 A
- Page 150 and 151: WVDP Phase 1 CSAPFigure A.10 WMA 1
- Page 152 and 153: WVDP Phase 1 CSAPFigure A.12 WMA 1
WVDP Phase 1 CSAPThis page intentionally left blank.Rev. 1 88