10.07.2015 Views

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 2 ⎯ Description of the Proposed Action and AlternativesFigure 2–10 Standard Design and Doctrinal Configuration of an Infantry PlatoonBattle CourseFigure 2–11 Location of Jump Towers for the 4/25th IBCT (Airborne)The 4/25 th would conduct weapons qualification on new ranges not previo<strong>us</strong>ly available to the 2/25 thID (L). Live fire activities would occur under Alternative B on ranges to include the QTRs, antiarmorlive fire tracking range, and the IPBC to be constructed at SBMR. Additionally SRTA trainingwould occur at the CACTF at KTA.February 2008 2–37 2/25th <strong>SBCT</strong> <strong>Final</strong> <strong>EIS</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!