10.07.2015 Views

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Appendix B ⎯ Cultural Resource Surveys: April 2004 – July 2007Table B-1 Cultural Resource Surveys Performed April 2004 – July 2007ProjectLocationProjectNumber Project NameProjectedFiscal YearStart Contractor Current Stat<strong>us</strong> FindingsSchofieldSouth57421/589422005 DPWGANDASchofieldSouthMotor Pool (PhaseI) MaintenanceShops: DSW &Water Tank (PhaseII)57462 MultipurposeQualificationRange (QTR-2)2005 GANDADPWPh. I Arch Survey: May 2003Geotest Monitoring: Mar 2004DSW&Water Tank Survey: Mar 06Enjoined: 27 Oct 2006Injunction lifted: 29 Dec 2006Construction: 49% completePh. I Arch Survey: May 2003Geotest Monitoring: Aug 2004Const. Monitoring Report: pendingConstruction: 70% complete1 Historic Site, NoCulturally SensitiveAreas, 2 isolatedartifactsNo HistoricProperties, 1 isolatedartifact, historicbottlesSchofieldWest57461 MultipurposeQualificationComplex (QTR-1)Enjoined: 27 Oct 2006Construction: enjoined2004 GANDA Arch Survey begin: Mar2003Volume I Report: Apr 2005Volume II Report: Aug 2005Volume III Draft Report: Nov2005Volume III <strong>Final</strong> Report: in prepVolume IV Draft Report: in prepUXO Clearance complete: Dec 046 ArchaeologicalSites, 14 featuresidentified in culturalsurvey (6 areassociated withknown sites).Construction complete: 15Oct 2006Enjoined: 27 Oct 2006Const. Monitor Report: in prepInjunction lifted: 29 Dec 06February 2008 B–2 2/25th <strong>SBCT</strong> <strong>Final</strong> <strong>EIS</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!