10.07.2015 Views

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 5 – Environmental Consequences5.5.14.3.4 Impacts from Maneuver TrainingLess Than Significant ImpactsManeuver training would continue at all at both FTC and PCMS <strong>us</strong>ing existing equipment andtraining methods. Maneuver training at FTC could include flights by UAVs. Impacts to energy <strong>us</strong>ewould be similar to those that occur currently. Therefore, impacts to energy demand and <strong>us</strong>e would beless than significant.5.5.15 FacilitiesTable 5-66 lists the potential impacts to facilities associated with implementation of Alternative D.Under the No Action Alternative, the 2/25 th <strong>SBCT</strong> would not be stationed at any of the alternativelocations, and therefore no <strong>SBCT</strong>-specific impacts to facilities would occur. No Action is expected tohave no long-term adverse impacts on existing facilities, including public services and utilitiesbeca<strong>us</strong>e no new facilities would be constructed to add demands to utilities infrastructure. No changesto the provision of police, fire, and emergency services would occur. Impacts are summarized in thefollowing subsections for each location.Table 5-66 Summary of Potential Impact to Facilities from Alternative DLocationHawaii Alaska ColoradoKTA/Activity Group SBMR DMR KLOA PTA FRA DTA FTC PCMSImpacts from CantonmentConstruction N/A N/A N/A N/A ☼ N/AImpacts from RangeConstruction☼ ☼ ☼ ☼ Impacts from Live-FireTraining☼ ☼ ☼ ☼ ☼ ☼ ☼ Impacts from Maneuver ☼ ☼ ☼ ☼ ☼ ☼ ☼ ☼Training = Significant + = Beneficial Impact = Significant but mitigable to less than significant N/A = Not Applicable☼ = Less than Significant= No Impact5.5.15.1 Hawaii5.5.15.1.1 Impacts from Cantonment ConstructionNo ImpactsSome construction renovation would occur as planned and as needed. No additional Soldiers wouldbe stationed at the base. Therefore, no impacts to facilities would be anticipated from cantonmentconstruction.February 2008 5-242 2/25th <strong>SBCT</strong> <strong>Final</strong> <strong>EIS</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!