10.07.2015 Views

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 5 – Environmental Consequences5.5.14.1 Hawaii5.5.14.1.1 Impacts from Cantonment ConstructionNo ImpactsSome construction renovation would occur as planned and as needed. Furthermore, no additionalSoldiers would be stationed at the base. Therefore, no impacts to energy would be anticipated fromcantonment construction.5.5.14.1.2 Impacts from Range ConstructionLess Than Significant ImpactsRange maintenance would proceed as needed. Range maintenance would temporarily increase the <strong>us</strong>eof energy (fuels) at the construction sites. This increase would be temporary and less than significantin the overall context of energy <strong>us</strong>age.5.5.14.1.3 Impacts from Live-fire TrainingLess Than Significant ImpactsThe number of required live-fire <strong>us</strong>er days per year at Hawaii would be near current levels and wouldnot change the amount of energy <strong>us</strong>e (fuels) around the training areas. Consequently, live-fire trainingis not expected to ca<strong>us</strong>e any changes to energy impacts, which would be less than significant.5.5.14.1.4 Impacts from Maneuver TrainingLess Than Significant ImpactsManeuver training would continue at all current training areas available for maneuver training.Maneuver training, which would occur at SBMR, DMR, KTA, and PTA, would not include flights byUAVs. Impacts to energy <strong>us</strong>e would be similar to what occur currently. Therefore, impacts to energy<strong>us</strong>e would be less than significant.5.5.14.2 Alaska5.5.14.2.1 Impacts from Cantonment ConstructionNo ImpactsNo cantonment construction is proposed at this time. However, some construction may occur on an asneeded basis in the future. Furthermore, no additional Soldiers would be stationed at the base.Therefore, no impacts to energy would be anticipated from cantonment construction.5.5.14.2.2 Impacts from Range ConstructionNo ImpactsNo range construction is proposed at this time. However, some construction may occur on an asneeded basis in the future. Furthermore, no additional Soldiers would be stationed at the base.Therefore, no impacts to energy would be anticipated from range construction.February 2008 5-240 2/25th <strong>SBCT</strong> <strong>Final</strong> <strong>EIS</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!