10.07.2015 Views

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 5 – Environmental Consequencescontinue. Continuing noise, d<strong>us</strong>t, or other indirect effects outside the installation boundaries couldpreclude locating residences or other sensitive receptors in these areas in the future. Consequently,impacts to land <strong>us</strong>e and recreation ca<strong>us</strong>ed by live-fire training would be less than significant.5.5.7 Traffic and TransportationTable 5-58 lists the potential impacts associated with traffic and transportation resource underimplementation of Alternative D. Under the No Action Alternative, the 2/25 th <strong>SBCT</strong> would not bestationed at any of the alternative locations, and therefore no <strong>SBCT</strong>-specific impacts to traffic andtransportation resources would occur. Impacts are summarized in the following subsections for eachlocation.Table 5-58 Summary of Potential Traffic and Transportation Impacts fromAlternative DLocationHawaii Alaska ColoradoKTA/Activity Group SBMR DMR KLOA PTA FRA DTA FTC PCMSImpacts from CantonmentConstruction N/A N/A N/A N/A ☼ N/AImpacts from RangeConstruction N/A N/A Impacts from Live-FireTraining ☼ ☼ ☼ Impacts from ManeuverTraining☼ ☼ ☼ ☼ ☼ ☼ = Significant + = Beneficial Impact = Significant but mitigable to less than significant N/A = Not Applicable☼ = Less than Significant= No Impact5.5.7.1 Hawaii5.5.7.1.1 Impacts from Cantonment ConstructionSome non-Stryker construction such as barracks renovations and maintenance activities would occuras planned. These activities are not anticipated to affect traffic patterns or volume of traffic flow, andthey would not require adj<strong>us</strong>tments to existing roadways and transportation networks.No Impacts5.5.7.1.2 Impacts from Range ConstructionThere would be no anticipated impacts to traffic anticipated with the maintenance of existing rangesto include maintenance of targetry, berms, trails and stream crossings. No mitigation would berequired.February 2008 5-213 2/25th <strong>SBCT</strong> <strong>Final</strong> <strong>EIS</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!