10.07.2015 Views

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SBCT Final EIS - Govsupport.us

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 5 – Environmental ConsequencesTable 5-13Summary of Potential Biological Impacts from Alternative ALocationActivity Group SBMR DMR KTA/KLOA PTAWetlandsImpacts from Cantonment Construction N/A N/A N/A N/AImpacts from Range Construction N/A N/A Impacts from Live-Fire Training N/A Impacts from Maneuver Training VegetationImpacts from Cantonment Construction N/A N/A N/A N/AImpacts from Range Construction ☼ N/A N/A ☼Impacts from Live-Fire Training ☼ N/A ☼ ☼Impacts from Maneuver Training ☼ ☼ ☼ ☼Noxio<strong>us</strong> WeedsImpacts from Cantonment Construction N/A N/A N/A N/AImpacts from Range Construction N/A N/A Impacts from Live-Fire Training N/A Impacts from Maneuver Training Threatened and Endangered SpeciesImpacts from Cantonment Construction N/A N/A N/A N/AImpacts from Range Construction N/A N/A Impacts from Live-Fire Training N/A / N/A Impacts from Maneuver Training / N/A General Wildlife and HabitatsImpacts from Cantonment Construction N/A N/A N/A N/AImpacts from Range Construction ☼ N/A N/A ☼Impacts from Live-Fire Training ☼ N/A ☼ ☼Impacts from Maneuver Training ☼ ☼ ☼ ☼ = Significant + = Beneficial Impact = Significant but mitigable to less than significant N/A = Not Applicable= Less than Significant☼= No ImpactConstruction and training would impact threatened and endangered species and their habitats. Giventraining levels would not dramatically increase and the majority of impacts would be in disturbed orexisting training areas, impacts are mitigable to less than significant for all areas except PTA.Construction and <strong>us</strong>e of the BAX at PTA will significantly impact sensitive species and criticalhabitats.Mitigation measures, planning considerations, and BMPs contained in the INRMP, IWFMP,Biological Opinions, Draft Oahu and PTA Implementation Plans, and other guidance documentswould minimize impacts to biological resources of concern. Most impacts can be avoided or reducedto a less than significant level. Range construction and <strong>us</strong>e at PTA will have significant, unmitigableimpacts on biological resources.February 2008 5-45 2/25th <strong>SBCT</strong> <strong>Final</strong> <strong>EIS</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!