Draft CMP HH - the Department of Environment
Draft CMP HH - the Department of Environment
Draft CMP HH - the Department of Environment
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1. INTRODUCTION<br />
Coastal and Wetland Biodiversity Management Project BGD/99/G31<br />
Hakaluki Haor <strong>Draft</strong> Conservation Management Plan<br />
Hakaluki Haor internationally recognised as a site for wintering populations for globally significant<br />
waterfowl, and regarded as one <strong>of</strong> <strong>the</strong> country’s most important fisheries and largest inland<br />
freshwater wetland, is now an ecosystem considered to have reached a state <strong>of</strong> critical degradation.<br />
In recognition <strong>of</strong> <strong>the</strong> urgent need to protect Hakaluki Haor, <strong>the</strong> Government <strong>of</strong> Bangladesh in 1999,<br />
under <strong>the</strong> provisions <strong>of</strong> <strong>the</strong> Bangladesh <strong>Environment</strong> Conservation Act (BECA), declared this site<br />
as an “Ecologically Critical Area” (ECA).<br />
In 2002, with technical and financial support from <strong>the</strong> United Nations Development Programme<br />
(UNDP) and <strong>the</strong> Global <strong>Environment</strong> Facility (GEF), <strong>the</strong> <strong>Department</strong> <strong>of</strong> <strong>Environment</strong> (DoE)<br />
initiated <strong>the</strong> “Coastal and Wetland Biodiversity Management at Cox’s Bazar and Hakaluki Haor”<br />
Project (CWBMP). The specific objective for Hakaluki Haor is “to ensure <strong>the</strong> conservation and<br />
sustainable use <strong>of</strong> globally significant wetland biodiversity at Hakaluki Haor through its<br />
management as an ECA”. This DRAFT Conservation Management Plan represents one <strong>of</strong> <strong>the</strong><br />
project’s key outputs for Hakaluki Haor. Defined in <strong>the</strong> CWBMP project document are a number <strong>of</strong><br />
important elements relating to <strong>the</strong> management <strong>of</strong> Hakaluki Haor all <strong>of</strong> which have been<br />
incorporated into this draft plan.<br />
It is important to note that as <strong>the</strong> availability <strong>of</strong> baseline data is still limited and as research efforts<br />
are still on-going, areas <strong>of</strong> this management plan are not as well covered or articulated as <strong>the</strong>y could<br />
be. In this regard, this management plan is to be regarded as working document in progress that will<br />
be updated as new information becomes available. The decision to move forward with <strong>the</strong><br />
development <strong>of</strong> this plan despite limited information was based on <strong>the</strong> urgent need to have a<br />
coherent framework to begin activities aimed at <strong>the</strong> sound and sustainable management <strong>of</strong> Hakaluki<br />
Haor as an ECA.<br />
Prepared by UNOPS Consultant Mr. Sulma Warne August/ September 2005 for Project BGD/99/G31 1