10.07.2015 Views

procedures for wet-tapping water mains - DC Water

procedures for wet-tapping water mains - DC Water

procedures for wet-tapping water mains - DC Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2. Wet-<strong>tapping</strong> CriteriaWet-taps shall be made in accordance with the following criteria:• The tapped connection shall be at least one size smaller than the pipe beingtapped, i.e. 12-inch diameter pipe being tapped, the maximum <strong>tapping</strong> diameterwould be 10-inch diameter.• Wet-taps shall be at least 6-inch diameter and larger, no 4-inch diameter taps or<strong>tapping</strong> valves are permitted. Two (2”) inch taps will be allowed with a preapproved<strong>tapping</strong> assembly.• Tapping sleeves shall be installed at least 4-feet from any exposed pipe joint orexisting tap.• Tapping sleeves shall be full-body ductile iron. Valves shall be as approved by<strong>DC</strong>WASA. Contractor shall submit shop drawings of the proposed sleeve andvalve to the Supervisor, Civil and Structural Section <strong>for</strong> approval prior toundertaking any work.• Wet-taps shall be made only by experienced contractors specializing in theinstallation of <strong>wet</strong>-taps. (Refer to Contractor experience and qualifications,Section 5 <strong>for</strong> requirements relative to this item.)• Wet-tap installation and testing shall be made in accordance with themanufacturer’s recommendations. The <strong>tapping</strong> saddle shall be designed <strong>for</strong> thetest pressure of the main being tapped.• Prior to undertaking any work, or ordering of materials, the Contractor shall testpit the pipe at the location of the tap and verify the outside diameter of the pipe toinsure that the correct size saddle is provided.• Contractor shall be responsible <strong>for</strong> obtaining a Public Space Permit from DDOTand complying with all requirements of this permit, including placement andmaintenance of temporary steel plating.• Contractor shall provide all required sheeting, shoring, bracing, de<strong>water</strong>ing, etc.to maintain a safe and dry excavation throughout the <strong>wet</strong>-tap installation process.3. Pipe Condition AssessmentRevised 1/25/2006 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!