Notes : For Filling in the Progress Statement Form1. Columns 2,3 and 4 must be initialed and date by the Contractor2. Columns 4 must be initialed and dated by the Administrator/ Chairman or otherduly authorised Engineer also.3. The date in Columns 2 should correspond to the date on which the order tocommence work is given to the contractor read with Clause 2 of the conditions ofcontract.4. The date in columns 3 must correspond to the period stated in Sub Clause (e) ofthe Memorandum below “Tender for works”.5. Columns 4. This will ordinarily be worked out proportionately; thus if Rs.24,000/- is the cost of the whole or portion of work tender for, and six monthsperiod of completion, then the monthly rate of progress should be Rs. 4,000. Ifnecessary, quantities may also be specified in this column at the discretion of theAdministrator/ Chairman.6. The Certificate as to intimation of acceptance of tender at the foot of the form,must be signed and date both by the Administrator/ Chairman or other dulyauthorised Engineer and the Contractor.Executive EngineerRSAMB BaranSignature of ContractorExecutive Engineer

Tender Inviting Authority: Rajasthan State Agricultural Marketing Board, Division BaranName of Work: Construction of Cement Concrete Internal Roads at Main Mandi Yard Under KUMS KhanpurContract No: /2012-13. Rates are Based on P.W.D. BSR Circle Jhalawar 2013 for Road works & 1st june 2012for Building WorksBidderName: Excess ( + ) %Sl.No.Description of work1 Clearing and grubbing road land includinguprooting wild vegetation, grass, bushes, shrubs,saplings and trees of girth upto 300 mm, removalof stumps of such trees cut earlier and disposal ofunserviceable materials and stacking ofserviceable material to be used or auctioned, uptoa lead of 1000 m including removal and disposal oftop organic soil not exceeding 150 mm inthickness as per Technical Specification Clause201.a) Manual MeansIn area of non-thorny jungleSCHEDULE OF WORKSNo.or UnitQty.FigureEstimated RateWords0.22 Hect. 22700.00 Rupees Twenty TwoThousand SevenHundred OnlyAMOUNTRs. P4994.002 Excavation for roadway in soil using manualmeans for carrying of cut earth to embankment sitewith a lift upto 1.5 m and lead upto 50 m as perTechnical Specification Clause 302.31507 Cum 56.00 Rupees Fifty Six Only 84392.003 Dismantling /digging out entire road wearing coatof bituminous surface including removal ofdismantled material up to all leads.4 Digging out entire WBM surface including sortingout serviceable material, its stacking and removalof rubbish upto all leads.5 Haulage of materials by tipper excluding cost ofloading , unloading & stacking Case-I SurfacedRoad with all leads.6 Loading of Earth, Sand, Moorum, Manure, Flyashby manual means including all leads.7 Unloading of Earth, Sand, Moorum, Manure,Flyash by manual means including all leads.8 Fillling in foundation trenches as per drawing andtechnical specification Clause 305.3.9a) Sand Filling9 Construction of granular sub-base by providingwell graded material, spreading in uniform layerswith motor grader on prepared surface, mixing bymix in place method with rotavator at OMC, andcompacting with smooth wheel roller to achievethe desired density, complete as per TechnicalSpecification Clause 401.a) For Grading III Material23 Cum. 192.05 Rupees OneHundred & NinetyTwo - Paise FiveOnly92 Cum. 44.85 Rupees Fourty Four -Paise Eighty FiveOnly3244 t.km 9.30 Rupees Nine - PaiseThirty Only1622 Cum. 23.00 Rupees TwentyThree Only1622 Cum 14.00 Rupees FourteenOnly614 Cum. 324.00 Rupees ThreeHundred & TwentyFour Only330 Cum. 350.00 Rupees ThreeHundred & Fifty Only4417.004126.0030169.0037306.0022708.00198936.00115500.00Signature of Tenderer with seal

Notes : For Filling in the Progress Statement Form1. Columns 2,3 and 4 must be initialed and date by the Contractor2. Columns 4 must be initialed and dated by the Administrator/ Chairman or otherduly authorised Engineer also.3. The date in Columns 2 should correspond to the date on which the order tocommence work is given to the contractor read with Clause 2 of the conditions ofcontract.4. The date in columns 3 must correspond to the period stated in Sub Clause (e) ofthe Memorandum below “Tender for works”.5. Columns 4. This will ordinarily be worked out proportionately; thus if Rs.24,000/- is the cost of the whole or portion of work tender for, and six monthsperiod of completion, then the monthly rate of progress should be Rs. 4,000. Ifnecessary, quantities may also be specified in this column at the discretion of theAdministrator/ Chairman.6. The Certificate as to intimation of acceptance of tender at the foot of the form,must be signed and date both by the Administrator/ Chairman or other dulyauthorised Engineer and the Contractor.Executive EngineerRSAMB BaranSignature of ContractorExecutive Engineer