BID DOCUMENTS - Rajasthan Agriculture Marketing Board
BID DOCUMENTS - Rajasthan Agriculture Marketing Board BID DOCUMENTS - Rajasthan Agriculture Marketing Board
Clause 12 AThe rate of any such work, except the items relating to foundations, which is inexcess of the deviation limit shall be determined in accordance with the provisionscontained in Clause 12 A.The quantum of additional work for each item shall not exceed 50% of theoriginal quantity given in agreement and the total value of additional work shall notexceed 20% of the total contract value, unless otherwise mutually agreed by the Engineerin-chargeand Contractor. The limit shall not be applicable on items relating to foundationwork which shall be executed as per original rates or provision of clause 12 (i) to (iv).In case of contract substituted items or additional items, which results inexceeding the deviation limit laid down in this clause except items relating to foundationwork, which the contractor is required to do under clause 12 above, the contractor shallwith-in seven days from the receipt of order, claim revision of the rate supported byproper analysis in respect of such items for quantities in excess of the deviation limitnotwithstanding the fact that the rates for such items exist in the tender for the main workor can be derived in accordance with the provision of sub clause (ii) of clause 12 and theEngineer-in-charge, may revise their rates having regard to the prevailing market ratesand the contractor shall be paid in accordance with the rates so fixed. The Engineer-inchargeshall, however, be at liberty to cancel his order to carryout such increasedquantities of work by giving notice in writing to the contractor and arrange to carry it outin such manner as he may consider advisable. But under no circumstances, the contractorshall suspend the work on the plea of non-settlement of rates of items failing under thisClause.All the provision of the preceding paragraph shall equally apply to the decrease inrates of items for quantities in excess of the deviation limit notwithstanding the fact thatthe rates for such item exist in the tender for the main work or can be derived inaccordance with provision of sub-clause (ii) of the preceding clause 12 and the Engineerin-chargemay revise such rates having regard to the prevailing rates unless otherwisemutually agreed by the Engineer-in-charge and the Contractor.Clause 13 : No compensation for alteration in or restriction of work to be carriedout.If, at any time after the commencement of the work, the RSAMB shall, for anyreason, whatsoever, not require the whole work, thereof, as specified in the tender, to becarried out, the Engineer-in-charge shall give notice, in writing, of the fact to theContractor, who shall have no claim to any payments or compensation, whatsoever, onaccount of any profit or advantage, which he might have derive from the execution of thework in full but which lie did not derive in consequence of full amount of the work nothaving been carried out. Neither, shall he have any claim for compensation by reason ofalterations having been made in the original specifications, drawings and design andinstructions, which shall involve any curtailment of the work, as originally contemplated.Provided, that the Contractor shall be paid the charges for the cartage only, of materialsactually brought to the sight of the work by him for bonafide use and rendered surplus asa result of the abandonment or curtailment of the work or any portion thereof, and takenthem back by the Contractor provided, however, that the Engineer-in-charge shall have,in all such cases, the option of taking overall or any such materials at their purchase priceSignature of ContractorExecutive Engineer
or at local market rates which ever may be less. In the case of such stores, having beenissued from RSAMB Stores, charges recovered including storage charge, shall berefunded after taking into consideration any deduction for claim on account of anydeterioration or damage while in the custody of the contractor, and in this respect thedecision of the Engineer-in-charge shall be final.Clause 14 : Action and compensation payable in case of bad workIf, it shall appear to the Administrator or any authorised authority or the Engineerin-chargeor his subordinates in-charge of the work or to the committee of retiredofficers/officers appointed by the RSAMB for the purpose that any work has beenexecuted with unsound, imperfect or unskillful workmanship, or with material of anyinferior description, or that any materials or articles provided by him for the execution ofwork are unsound or of a quality inferior to that contracted, or otherwise not inaccordance with contract, the Contractor shall on demand in writing from the Engineerin-charge,specifying the work/materials articles complained of, not with standing that thesame may have been inadvertently passed, certified and paid for, will rectify or removeand reconstruct the work, so specified, in whole or in part, as the case may be, remove thematerials or articles, so specified, and provide other proper and suitable materials orarticles, at his own cost and in the event of his failing to do so, within a period to bespecified by the Engineer-in-charge in his demand, as aforesaid, then the Contractor shallbe liable to pay compensation, at the rate of 1%, on the tendered amount of work forevery week not exceeding 10%, while his failure to do so shall continue, and in the caseof any such failure, the Engineer-in-charge may rectify or remove and re-execute thework or remove and replace with others, the materials or articles complained of as thecase may be, at the risk and expense, in all respect of the contractor.Clause 15 :Work to be open to inspection : Contractor or his responsible Agent tobe presentAll work under or in course of execution or executed in pursuance of the contract,shall, at all times be open to inspection and supervision of the Engineer-in-charge and hissuperior officers e.g. Additional Chief Engineer, Superintending Engineer and hissubordinates and any other authorised agency of the RSAMB and the contractor shall, atall times during the usual working hours, and at all other times at which reasonable noticeof the intention of the Engineer-in-charge or his subordinate and any other authorisedagency of RSAMB or committee of retired officer/officers appointed by the RSAMB forthe purpose to visit the works shall have been given to the Contractor, either himself bepresent to receive orders and instructions or have a responsible agent, duly accredited inwriting, present for the purpose. Orders given to the Contractor’s agent shall beconsidered to have the same force as if they had been given to the Contractor himself.Clause 16 : Notice to be given before any work is covered upThe Contractor shall give not less than 7 days notice, in writing, to the Engineerin-chargeor his subordinate-in-charge of the work, before covering up or otherwiseplacing beyond the reach of measurement, any work in order that the same may bemeasured, and correct dimensions thereof, be taken before the same is so covered up orplaced beyond the reach of measurement and shall not cover up or place beyond the reachof measurement any work without the consent in writing of the Engineer-in-charge of thework, and if, any work shall be covered up or placed beyond the reach of measurementwithout such notice having been given or consent obtained, the same shall be uncoveredSignature of ContractorExecutive Engineer
- Page 1 and 2: BID DOCUMENTSForConstruction of Cem
- Page 3 and 4: BID DOCUMENTFORNAME OF WORK: -Const
- Page 5 and 6: (RPWA-100)RAJASTHAN STATE AGRICULTU
- Page 7 and 8: Diploma holder engineers may pay Ea
- Page 9 and 10: 20. Mixing of C.C. must be carried
- Page 11 and 12: (ii)(iii)(iv)(v)(vi)Lifts and Escal
- Page 13 and 14: the programme of completion given i
- Page 15 and 16: 8. The memorandum of work tendered
- Page 17 and 18: 25. After acceptance of the tender,
- Page 19 and 20: Conditions of ContractClause 1 : Se
- Page 21 and 22: In case delayed period over a parti
- Page 23 and 24: Contractor shall not be entitled to
- Page 25 and 26: along with the estimate of the cost
- Page 27 and 28: procure and shall be supplied such
- Page 29: (iii)(iv)(v)If the rates for the al
- Page 33 and 34: public officer or person, in the em
- Page 35 and 36: of the Engineer-in-charge shall be
- Page 37 and 38: the expenses of keeping their labou
- Page 39 and 40: 11 Cutting of branches of trees, sh
- Page 41 and 42: Clause 38 : Fair Wage Clause(a)The
- Page 43 and 44: the risk of the contractor until th
- Page 45 and 46: (D) PetroleumP f (F i - F 0 )V f =
- Page 47 and 48: The above index number MP 0 & W 0 a
- Page 49 and 50: 10. In case the contractor does not
- Page 51 and 52: S.No.Schedule of Materials to be su
- Page 53 and 54: Tender Inviting Authority: Rajastha
- Page 55: Sl.No.Description of work14 Supplyi
or at local market rates which ever may be less. In the case of such stores, having beenissued from RSAMB Stores, charges recovered including storage charge, shall berefunded after taking into consideration any deduction for claim on account of anydeterioration or damage while in the custody of the contractor, and in this respect thedecision of the Engineer-in-charge shall be final.Clause 14 : Action and compensation payable in case of bad workIf, it shall appear to the Administrator or any authorised authority or the Engineerin-chargeor his subordinates in-charge of the work or to the committee of retiredofficers/officers appointed by the RSAMB for the purpose that any work has beenexecuted with unsound, imperfect or unskillful workmanship, or with material of anyinferior description, or that any materials or articles provided by him for the execution ofwork are unsound or of a quality inferior to that contracted, or otherwise not inaccordance with contract, the Contractor shall on demand in writing from the Engineerin-charge,specifying the work/materials articles complained of, not with standing that thesame may have been inadvertently passed, certified and paid for, will rectify or removeand reconstruct the work, so specified, in whole or in part, as the case may be, remove thematerials or articles, so specified, and provide other proper and suitable materials orarticles, at his own cost and in the event of his failing to do so, within a period to bespecified by the Engineer-in-charge in his demand, as aforesaid, then the Contractor shallbe liable to pay compensation, at the rate of 1%, on the tendered amount of work forevery week not exceeding 10%, while his failure to do so shall continue, and in the caseof any such failure, the Engineer-in-charge may rectify or remove and re-execute thework or remove and replace with others, the materials or articles complained of as thecase may be, at the risk and expense, in all respect of the contractor.Clause 15 :Work to be open to inspection : Contractor or his responsible Agent tobe presentAll work under or in course of execution or executed in pursuance of the contract,shall, at all times be open to inspection and supervision of the Engineer-in-charge and hissuperior officers e.g. Additional Chief Engineer, Superintending Engineer and hissubordinates and any other authorised agency of the RSAMB and the contractor shall, atall times during the usual working hours, and at all other times at which reasonable noticeof the intention of the Engineer-in-charge or his subordinate and any other authorisedagency of RSAMB or committee of retired officer/officers appointed by the RSAMB forthe purpose to visit the works shall have been given to the Contractor, either himself bepresent to receive orders and instructions or have a responsible agent, duly accredited inwriting, present for the purpose. Orders given to the Contractor’s agent shall beconsidered to have the same force as if they had been given to the Contractor himself.Clause 16 : Notice to be given before any work is covered upThe Contractor shall give not less than 7 days notice, in writing, to the Engineerin-chargeor his subordinate-in-charge of the work, before covering up or otherwiseplacing beyond the reach of measurement, any work in order that the same may bemeasured, and correct dimensions thereof, be taken before the same is so covered up orplaced beyond the reach of measurement and shall not cover up or place beyond the reachof measurement any work without the consent in writing of the Engineer-in-charge of thework, and if, any work shall be covered up or placed beyond the reach of measurementwithout such notice having been given or consent obtained, the same shall be uncoveredSignature of ContractorExecutive Engineer