10.07.2015 Views

BID DOCUMENTS - Rajasthan Agriculture Marketing Board

BID DOCUMENTS - Rajasthan Agriculture Marketing Board

BID DOCUMENTS - Rajasthan Agriculture Marketing Board

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Clause 10 C : Hire of Plant and MachinerySpecial Plant and Machinery, required for execution of the work, may be issued tothe Contractor, if available, on the rates of hire charges and other terms and conditions asper RSAMB Rules, as per Schedule annexed to these conditions. Rates of such Plant &Machinery shall be got revised periodically so as to bring them at par with market rate.Clause 11 : Works to be executed in accordance with Specifications, Drawings,Orders etc.The Contractor shall execute the whole and every part of the work in the mostsubstantial and satisfactory manner and both as regards materials and otherwise in everyrespect, in strict accordance with the Specifications. The Contractors shall also confirmedexactly fully and faithfully to the designs, drawings and instructions in writing relating tothe work signed by the Engineer-in-charge and lodged in his office and to which theContractor shall be entitled to have access at such office or on the site of the work for thepurpose of inspection during office hours and the Contractor shall, if he so require, beentitled, at his own expense, to make or cause to be made copies of specifications and ofall such designs, drawings and instructions, as aforesaid. A certificate of executing worksas per approved design and specifications etc., shall be given on each Running AccountBill.The specifications of work, material, methodology of execution, drawings anddesigns shall be signed by the Contractor and Executive Engineer while executingagreement and shall form part of agreement.Clause 12The Engineer-in-charge shall have power to make any alterations, omissions oradditions to or substitutions for the original specifications, drawings, designs andinstructions, that may appear to him to be necessary during the progress of the work andthe Contractor shall carry out the work in accordance with any instructions which may begiven to him in writing signed by the Engineer-in-charge, and such alterations, omissions,additions or substituted work, which the contractor may be directed to do in the mannerabove specified, as pert of the work, shall be carried out by the contractor on the sameconditions in all respects on which he agreed to do the main work. The time for thecompletion of the work shall be extended in the proportion that the altered, additional orsubstituted work bears to the original contract work, and the certificate of the Engineerin-chargeshall be conclusive as to such proportion. The rates of such additional, alteredor substituted work under this clause shall be worked out in accordance with thefollowing provisions in their respective order:(i)(ii)If the rates for the additional, altered or substituted work are specified in thecontract for the work, the contractor is bound to carry out the additional, altered orsubstituted work at the same rates as are specified in the contract for the work.If the rates for the additional, altered or substituted work are not specificallyprovided in the contract for the work, the such rates will be derived from the ratesfor a similar class of work as are specified in the contract for the work.Signature of ContractorExecutive Engineer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!