General information

General information General information

daryapetrosazeh.com
from daryapetrosazeh.com More from this publisher
20.11.2012 Views

Salafchegan Water Treatment Package Containing: - RO Unit ,Capacity: 50 m 3 /hr Client: Salafchegan Pipe Company Type of Contract: EPC Location: Salafchegan Period of Eexecution: 3 months Mahshahr Water Treatment Package Containing: - RO Unit ,Capacity: 50 m 3 /hr Client: Mahshahr Pipe Company Type of Contract: EPC Location: Mahshahr Period of Eexecution: 3 months Khorasan Waste Water Treatment Plant Containing: - Waste Water Treatment plant Client: Iran khodro sazeh Type of Contract: Engineering Location: Khorasan Period of Eexecution: 9 months

1.3. Under Execution Projects Basrah Refinery Waste Water Treatment Plant Containing: - Oily Water Treatment plant ,capacity 1200 m 3 /hr - Sanitary Treatment plant, Capacity 50 m 3 /hr - Spent caustic Stream traetment, capacity 50 m 3 /hr Client: South Refineries Company (SRC)- Iraq Type of Contract: EP Location: Iraq-Basrah Period of Execution: 17 months Darquain Oil Field Water Treatment Plant Containing: - Water Treatment Plant ,Capacity 120 m 3 /hr Client: ENI Co. Type of Contract: EPC Location: Darquain Period of Execution: 11 months LATAKIA SEWAGE TREATMENT PLANT- Syria Containing: - Sewage Treatment Plant ,Capacity 9200 m 3 /hr Client: Tehran Mirab Type of Contract: Engineering Location: Latakia (Syria) Period of Execution: 5 months

1.3. Under Execution Projects<br />

Basrah Refinery Waste Water Treatment Plant<br />

Containing:<br />

- Oily Water Treatment plant ,capacity 1200 m 3 /hr<br />

- Sanitary Treatment plant, Capacity 50 m 3 /hr<br />

- Spent caustic Stream traetment, capacity 50 m 3 /hr<br />

Client: South Refineries Company (SRC)- Iraq<br />

Type of Contract: EP<br />

Location: Iraq-Basrah<br />

Period of Execution: 17 months<br />

Darquain Oil Field Water Treatment Plant<br />

Containing:<br />

- Water Treatment Plant ,Capacity 120 m 3 /hr<br />

Client: ENI Co.<br />

Type of Contract: EPC<br />

Location: Darquain<br />

Period of Execution: 11 months<br />

LATAKIA SEWAGE TREATMENT PLANT- Syria<br />

Containing:<br />

- Sewage Treatment Plant ,Capacity 9200 m 3 /hr<br />

Client: Tehran Mirab<br />

Type of Contract: Engineering<br />

Location: Latakia (Syria)<br />

Period of Execution: 5 months

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!