General information
General information General information
Salafchegan Water Treatment Package Containing: - RO Unit ,Capacity: 50 m 3 /hr Client: Salafchegan Pipe Company Type of Contract: EPC Location: Salafchegan Period of Eexecution: 3 months Mahshahr Water Treatment Package Containing: - RO Unit ,Capacity: 50 m 3 /hr Client: Mahshahr Pipe Company Type of Contract: EPC Location: Mahshahr Period of Eexecution: 3 months Khorasan Waste Water Treatment Plant Containing: - Waste Water Treatment plant Client: Iran khodro sazeh Type of Contract: Engineering Location: Khorasan Period of Eexecution: 9 months
1.3. Under Execution Projects Basrah Refinery Waste Water Treatment Plant Containing: - Oily Water Treatment plant ,capacity 1200 m 3 /hr - Sanitary Treatment plant, Capacity 50 m 3 /hr - Spent caustic Stream traetment, capacity 50 m 3 /hr Client: South Refineries Company (SRC)- Iraq Type of Contract: EP Location: Iraq-Basrah Period of Execution: 17 months Darquain Oil Field Water Treatment Plant Containing: - Water Treatment Plant ,Capacity 120 m 3 /hr Client: ENI Co. Type of Contract: EPC Location: Darquain Period of Execution: 11 months LATAKIA SEWAGE TREATMENT PLANT- Syria Containing: - Sewage Treatment Plant ,Capacity 9200 m 3 /hr Client: Tehran Mirab Type of Contract: Engineering Location: Latakia (Syria) Period of Execution: 5 months
- Page 7 and 8: 1.1.2. NEDA NAZEMI Education: Maste
- Page 9 and 10: 1.1.5. LADAN BEHROOZI Education: 20
- Page 11 and 12: � Fasham water treatment plant. D
- Page 13 and 14: � Ramsar water refinary retaining
- Page 15 and 16: � Oct.1999 - Oct.2000 (07. 78 - 0
- Page 17 and 18: � Larestan Water Treatment Plant,
- Page 19 and 20: 1.5. I & C Department 1.5.1. ARMAN
- Page 21 and 22: � Rahkar Moderator , Coolant Puri
- Page 23 and 24: 1.8. CAD Department 1.8.1. ZARINDOK
- Page 25 and 26: Working Projects: � Darquain Oil
- Page 34 and 35: Organization Data 1.1. Organization
- Page 36 and 37: 1.3. Quick Recruiting of Skilled Pe
- Page 38 and 39: 1.5. Ability to purchase projects m
- Page 41 and 42: Our proficiencies 1.1. Municipal &
- Page 43 and 44: comprise air scour, combined air sc
- Page 45 and 46: 1.2. Municipal Sewage Treatment 1.2
- Page 47 and 48: the grit collected will be transfer
- Page 49: MBR Applications: • Suitable for
- Page 52 and 53: Client: Namvaran Type of Contract:
- Page 54 and 55: Fajr Petrochemical Company ---- Wat
- Page 58: TARTUS SEWAGE TREATMENT PLANT- Syri
Salafchegan Water Treatment Package<br />
Containing:<br />
- RO Unit ,Capacity: 50 m 3 /hr<br />
Client: Salafchegan Pipe Company<br />
Type of Contract: EPC<br />
Location: Salafchegan<br />
Period of Eexecution: 3 months<br />
Mahshahr Water Treatment Package<br />
Containing:<br />
- RO Unit ,Capacity: 50 m 3 /hr<br />
Client: Mahshahr Pipe Company<br />
Type of Contract: EPC<br />
Location: Mahshahr<br />
Period of Eexecution: 3 months<br />
Khorasan Waste Water Treatment Plant<br />
Containing:<br />
- Waste Water Treatment plant<br />
Client: Iran khodro sazeh<br />
Type of Contract: Engineering<br />
Location: Khorasan<br />
Period of Eexecution: 9 months