General information
General information General information
Client: Namvaran Type of Contract: Engineering & Procurement Location: Kermanshah Period of Execution: 14 months Razi Third Ammonia plant packages Containing: - Cooling water side stream filters - Sea water cooling tower side stream filters Client: Razi petrochemical Co. Type of Contract: Engineering Location: Bandar Imam Period of Execution: 14 months NGL – 1200 plant Containing: - Pretreatment & Backwash facilities of demin package - Water treatment plant (demin unit) Capacity: 14 m3/hr - Waste water treatment plant (API) - Chlorination package Client: OIEC Type of Contract: EPC Location: Gachsaran Period of Execution: 10 months NGL – 1300 plant Containing: - Pretreatment & Backwash facilities of demin package - Water treatment plant (demin unit) Capacity: 14 m3/hr - Waste water treatment plant (API) - Chlorination package Client: OIEC Type of Contract: EPC Location: Gachsaran Period of Execution: 10 months
Kharg Petrochemical Complex -Waste Water Treatment Plant Containing: - Oily wastewater Capacity: 35 m3/hr - Sanitary wastewater Capacity: 75 m3/day Client: Kharg petrochemical co. Type of Contract: EPC Location: Kharg Island Period of Execution: 9 months Kharg Onshore Oily WasteWater Tratment Plant Containing: - IGF system ,Capacity: 354 m3/hr - Transfer & Collection Pipelines - Sanitary WasteWater Capacity: 75 m3/day Client: IOOC Type of Contract: EPC Location: Kharg Island Period of Execution: 20 months Fajr petrochemical company ---- Effluent Treatment Plant Containing: - Low salinity effluent Capacity: 421 m3/hr - High salinity effluent Capacity: 70 m3/hr - Sanitary effluent Capacity: 69 m3/hr Client: Fajr petrochemical company Type of Contract: EPC Location: Bandar Imam Period of Execution: 10 months
- Page 2 and 3: General information 1.1. Name: DARY
- Page 4: � Water, Waste Water & Sewage pla
- Page 7 and 8: 1.1.2. NEDA NAZEMI Education: Maste
- Page 9 and 10: 1.1.5. LADAN BEHROOZI Education: 20
- Page 11 and 12: � Fasham water treatment plant. D
- Page 13 and 14: � Ramsar water refinary retaining
- Page 15 and 16: � Oct.1999 - Oct.2000 (07. 78 - 0
- Page 17 and 18: � Larestan Water Treatment Plant,
- Page 19 and 20: 1.5. I & C Department 1.5.1. ARMAN
- Page 21 and 22: � Rahkar Moderator , Coolant Puri
- Page 23 and 24: 1.8. CAD Department 1.8.1. ZARINDOK
- Page 25 and 26: Working Projects: � Darquain Oil
- Page 34 and 35: Organization Data 1.1. Organization
- Page 36 and 37: 1.3. Quick Recruiting of Skilled Pe
- Page 38 and 39: 1.5. Ability to purchase projects m
- Page 41 and 42: Our proficiencies 1.1. Municipal &
- Page 43 and 44: comprise air scour, combined air sc
- Page 45 and 46: 1.2. Municipal Sewage Treatment 1.2
- Page 47 and 48: the grit collected will be transfer
- Page 49: MBR Applications: • Suitable for
- Page 54 and 55: Fajr Petrochemical Company ---- Wat
- Page 56 and 57: Salafchegan Water Treatment Package
- Page 58: TARTUS SEWAGE TREATMENT PLANT- Syri
Client: Namvaran<br />
Type of Contract: Engineering & Procurement<br />
Location: Kermanshah<br />
Period of Execution: 14 months<br />
Razi Third Ammonia plant packages<br />
Containing:<br />
- Cooling water side stream filters<br />
- Sea water cooling tower side stream filters<br />
Client: Razi petrochemical Co.<br />
Type of Contract: Engineering<br />
Location: Bandar Imam<br />
Period of Execution: 14 months<br />
NGL – 1200 plant<br />
Containing:<br />
- Pretreatment & Backwash facilities of demin package<br />
- Water treatment plant (demin unit) Capacity: 14 m3/hr<br />
- Waste water treatment plant (API)<br />
- Chlorination package<br />
Client: OIEC<br />
Type of Contract: EPC<br />
Location: Gachsaran<br />
Period of Execution: 10 months<br />
NGL – 1300 plant<br />
Containing:<br />
- Pretreatment & Backwash facilities of demin package<br />
- Water treatment plant (demin unit) Capacity: 14 m3/hr<br />
- Waste water treatment plant (API)<br />
- Chlorination package<br />
Client: OIEC<br />
Type of Contract: EPC<br />
Location: Gachsaran<br />
Period of Execution: 10 months