General information
General information General information
1.5. Ability to purchase projects material & requirements 100,000,000,000- Rial in year 1.6. Scheduling and cost control � Scheduling System: Microsoft Project, Primavera & Microsoft Excel � Cost control System: Finantial softwares 1.7. Quality Control System � Quality Control of purchased products against the required standards. Implimention of methods for optimizing the production proccess. � Design of Statistical methods for controling the quality of manufacturs products � Inspection and control of perchased products and raw material � Welding Quality Testing (WQT) instruction � None Distructive Testing (NDT) procedures � PQR and WPS instructions 1.8. List Of Project Activities � Design & Engineering � Manufacturing of Special Equipment � Procurment � Sea Shipment � Building Construction � Instalation of Mechanical equipment � Instalation of Electrical and Communicatin Systems � Installation of Instruments � Installation of Control System � PLC Programming � Performance testing and commissioning
� Painting and covering � Insulation Work � Marketing of manufatured equipments � After sales services � Supervision on Construction and installation � Training � Execution � Equipment Maintanance � Spare Parts supply
- Page 2 and 3: General information 1.1. Name: DARY
- Page 4: � Water, Waste Water & Sewage pla
- Page 7 and 8: 1.1.2. NEDA NAZEMI Education: Maste
- Page 9 and 10: 1.1.5. LADAN BEHROOZI Education: 20
- Page 11 and 12: � Fasham water treatment plant. D
- Page 13 and 14: � Ramsar water refinary retaining
- Page 15 and 16: � Oct.1999 - Oct.2000 (07. 78 - 0
- Page 17 and 18: � Larestan Water Treatment Plant,
- Page 19 and 20: 1.5. I & C Department 1.5.1. ARMAN
- Page 21 and 22: � Rahkar Moderator , Coolant Puri
- Page 23 and 24: 1.8. CAD Department 1.8.1. ZARINDOK
- Page 25 and 26: Working Projects: � Darquain Oil
- Page 34 and 35: Organization Data 1.1. Organization
- Page 36 and 37: 1.3. Quick Recruiting of Skilled Pe
- Page 41 and 42: Our proficiencies 1.1. Municipal &
- Page 43 and 44: comprise air scour, combined air sc
- Page 45 and 46: 1.2. Municipal Sewage Treatment 1.2
- Page 47 and 48: the grit collected will be transfer
- Page 49: MBR Applications: • Suitable for
- Page 52 and 53: Client: Namvaran Type of Contract:
- Page 54 and 55: Fajr Petrochemical Company ---- Wat
- Page 56 and 57: Salafchegan Water Treatment Package
- Page 58: TARTUS SEWAGE TREATMENT PLANT- Syri
� Painting and covering<br />
� Insulation Work<br />
� Marketing of manufatured equipments<br />
� After sales services<br />
� Supervision on Construction and installation<br />
� Training<br />
� Execution<br />
� Equipment Maintanance<br />
� Spare Parts supply