General information

General information General information

daryapetrosazeh.com
from daryapetrosazeh.com More from this publisher
20.11.2012 Views

1.5. Ability to purchase projects material & requirements 100,000,000,000- Rial in year 1.6. Scheduling and cost control � Scheduling System: Microsoft Project, Primavera & Microsoft Excel � Cost control System: Finantial softwares 1.7. Quality Control System � Quality Control of purchased products against the required standards. Implimention of methods for optimizing the production proccess. � Design of Statistical methods for controling the quality of manufacturs products � Inspection and control of perchased products and raw material � Welding Quality Testing (WQT) instruction � None Distructive Testing (NDT) procedures � PQR and WPS instructions 1.8. List Of Project Activities � Design & Engineering � Manufacturing of Special Equipment � Procurment � Sea Shipment � Building Construction � Instalation of Mechanical equipment � Instalation of Electrical and Communicatin Systems � Installation of Instruments � Installation of Control System � PLC Programming � Performance testing and commissioning

� Painting and covering � Insulation Work � Marketing of manufatured equipments � After sales services � Supervision on Construction and installation � Training � Execution � Equipment Maintanance � Spare Parts supply

1.5. Ability to purchase projects material & requirements<br />

100,000,000,000- Rial in year<br />

1.6. Scheduling and cost control<br />

� Scheduling System:<br />

Microsoft Project, Primavera & Microsoft Excel<br />

� Cost control System:<br />

Finantial softwares<br />

1.7. Quality Control System<br />

� Quality Control of purchased products against the required standards.<br />

Implimention of methods for optimizing the production proccess.<br />

� Design of Statistical methods for controling the quality of manufacturs<br />

products<br />

� Inspection and control of perchased products and raw material<br />

� Welding Quality Testing (WQT) instruction<br />

� None Distructive Testing (NDT) procedures<br />

� PQR and WPS instructions<br />

1.8. List Of Project Activities<br />

� Design & Engineering<br />

� Manufacturing of Special Equipment<br />

� Procurment<br />

� Sea Shipment<br />

� Building Construction<br />

� Instalation of Mechanical equipment<br />

� Instalation of Electrical and Communicatin Systems<br />

� Installation of Instruments<br />

� Installation of Control System<br />

� PLC Programming<br />

� Performance testing and commissioning